Texas Nodal EMS Forced Outage Detection Business Requirements Document Carlos Gonzalez-Perez – August 21st, 2006 1
2
As is and To be Sub processes Assumptions and Dependencies
Document Contents Proposed System Scope As is and To be Sub processes Assumptions and Dependencies Definitions and Acronyms Functional Requirements Supplementary Requirements Sub-Process Coverage Protocols Coverage FOD Activity Map 2
3
Scope, Business Sub Processes and Assumptions
Proposed System Scope FOD is a new application to detect and alarm unplanned status changes in transmission elements and generation resources Business Processes impacted: Operations Support Engineering Outage Coordination Business Sub process The FOD function is not currently in place. NO As-If Process No To-be Sub process generated for FOD Assumptions: The Network Real Time Operational Model used in the real time sequence is available to FOD. Outage Scheduler (OS) DB is populated with up-to-date planned schedules Telemetered Resource Status the same as in COPs SCADA manual overrides will be available to FOD 3
4
Activity Diagram for Forced Outage Detection
4
5
Functional Requirements
FOD-FR1: Forced Output Input Real Time Telemetry, OS and COP with resource status FOD-FR2: Force Outage Cycle The application will execute periodically. Period to be configurable FOD-FR3: State Change Alarm Detect and alarm for unplanned status change of Breaker/switch, Status for Resources, Transmission Lines, Transformers and Load disconnection FOD-FR4: Forced Outage Detection Detect change in status Check for the outage in the OS. Discrepancies of more than xx minutes indicate Forced Outage Alarm/Display of forced outages COPS used to distinguish between forced resource outage or shutting down generation FOD-FR5: Resource Status Deviation Checking conflicts in the resource status against COPS, OS, and Resource Status from SCADA. FOD-FR6: Force Outage Display. According to outage type and other custom filtering FOD-FR7: Forced Outage Continued Alarming. Alarm is generated when the Forced Outage is detected and not corrected in the OS after 2 hours. The alarm is persistent every 15 minutes FOD-FR8: Forced Outage and QSE Performance Reporting Input. FOD outputs need to be archived for audit and reporting purposes. 5
6
Supplementary Requirements
FOD-SR1: No degradation of Performance. Automatic re-starting FOD shall finish processing before the end of each cycle FOD-SR2: Interfaces SCADA Outage Scheduler COP FOD-SR2: User Interface Special displays will be generated for FOD 6
7
Protocol Coverage Protocol Sub-Section # (To the lowest level of granularity as possible) Section Title Coverage by Requirements (Full/Partial) Management of Resource or Transmission Forced Outages or Maintenance Outages. Partial Notice of Forced Outage or Unavoidable Extension of Planned or Maintenance Outage Due to Unforeseen Events. 6.4.7 Notification of forced outage via telemetered status point and QSE. Breakers/Switch Status Alarm Processor and Forced Outage Detection Processor Full (d) Alert Regulation Service Energy Deployment Criteria 7