RMR Update November 6, 2002 11/05/2002.

Similar presentations


Presentation on theme: "RMR Update November 6, 2002 11/05/2002."— Presentation transcript:

1 RMR Update November 6, 2002 11/05/2002

2 Standby Payment - Protocol References
Section 22F RMR Agreement Section Capacity(Standby)Payment 11/05/2002

3 Capacity (Standby) Payment
Hourly “Standby Price” in $/MW Determine the levelized annual carrying costs of a then current simple-cycle gas turbine generator set – sized to match RMR unit. Based upon the capital costs of this proxy turbine plus installation costs. ERCOT used a cost estimate developed by GE. Include fixed O&M. ERCOT used the DOE Energy Information Administration Assumptions to the Annual Energy Outlook. As specified in Protocols: 15 year life, 70% financing at prime rate, 30% equity with 10%ROE Hourly Standby Price = 70% of hourly cost of proxy unit 11/05/2002

4 Proxy Turbines w/Standby Price
11/05/2002

5 Use heat rate for contracted unit
Heat Rates Use heat rate for contracted unit 11/05/2002

6 Estimated Costs 11/05/2002

7 RMR vs. Transmission Transmission upgrades were not a viable option for the current contracts which expire at the end of December Projects have been identified that will eliminate many of the current RMR requirements ERCOT is establishing a stronger capability to adopt and track these projects ERCOT will use emerging RMR data to evaluate justification for additional transmission 11/05/2002

8 Minimum Take Provision
Minimum take is not addressed in the Protocols The Frontera unit had environmental requirements which had to be considered AEP had no similar environmental issues 11/05/2002

9 RMR in 2003 A study of ERCOT’s 2003 RMR requirements is underway and should be completed by the end of November Other Resource Entities have contacted ERCOT to announce their plans to shut down or “mothball” certain units in the near term – ERCOT has determined that none of those units would warrant RMR contracts through January 1, 2003 11/05/2002

10 Day Ahead Schedule Process
By 0600, QSE sends ERCOT Availability Plan By 0900, ERCOT sends QSE Initial Delivery Plan At 1630, ERCOT may update Delivery Plan At 1830, after RPRS study, ERCOT may update Delivery Plan Delivery Plan levels may be revised closer to real-time QSE enters Delivery Plan levels in their Energy Schedule with ISO as Receiver 11/05/2002

11 RMR Energy Pricing and Management
11/05/2002

12 RMR Energy Payments (Protocols 6.8.3.3)
ERMRuiq = -1 * min(Rsiu,Mriu) * ((RMREnergyMultu * GasPrIndxu) + VarCostCompu) Billable Quantity Min(RSiu,MRiu) RS: Resource Scheduled quantity MR:Metered value for the Resource Price RMREnergyMultu Heat Rate per RMR Agreement Average of last two years of actual heat rate GasPrIndxu Published Gas Index per RMR Agreement Fuel Index in Houston Ship Channel Transportation fee Gas swing service fee VarCostCompu Variable Cost per RMR Agreement The non-fuel variable O&M cost incurred when the unit operates and not recovered by the standby fee Energy Payments based on Contract Amounts refers to ERCOT purchasing the energy itself. To determine the payment due, the heat rate (determined by the RMR unit) is multiplied by the gas index (also determined by the RMR unit). The total is added to the variable cost which is a contracted amount. This total is then multiplied by the lesser amount between, either the scheduled quantity or the actual quantity produced. For example if the RS is 100 and the MR is 90, 90 would be used in the equation. 11/05/2002

13 RMR Cost Uplift Billable Quantity LRS Load Share Ratio
(Protocols ) LARMRiq = -1 * (SUM(ERMRiq) + SUM(SURMRiq) + SUM(SBRMRiq) + SUM(UMRMRiq) + SUM(ERRMRiq) * LRSiq) Billable Quantity LRS Load Share Ratio Price ERMRiq RMR Energy payment to QSE SURMRiq RMR Start Up payment to QSE SBRMRiq RMR Standby payment to QSE UMRMRiq RMR Unexcused Misconduct Fee charged from QSE ERRMRiq RMR Energy Rebate Amount The Settlement Obligation for RMR Service refers to the collection of payments from the QSEs who had load to pay the RMRs providing the service. 11/05/2002

14 Actual RMR Energy Cost RMR Schedule Resource Obligation
100MW (QSE A, South) MW (ERCOT, South) QSE A gets RMR energy payment RMR Schedule is the same as no energy schedule but provide 100MW Up Balancing Energy RMR reduced BENA amount by: RMR Schedule * MCPESouth Actual RMR energy cost is equal to: RMR Energy Payment - RMR Schedule * MCPESouth The Settlement Obligation for RMR Service refers to the collection of payments from the QSEs who had load to pay the RMRs providing the service. 11/05/2002


Download ppt "RMR Update November 6, 2002 11/05/2002."