Company Overview The Beck Group: Beck Technology Ltd.:
Award winning Design and Construction Operating since 1912 Privately held – 3rd generation 90% repeat customers Beck Technology Ltd.: Patented BIM Software Cost Modeling Services Customers include many competitors of The Beck Group
4
Construction Documents
What's the Problem? Rework Conceptual Phase Schematic Phase Design Development Construction Documents Bid Phase Construction Phase Deliverable from A/E to Owner Concept plans Preliminary cost estimate % (Limited GC involvement) Preliminary schedule (Limited GC involvement) Value Engineering = Cost Reduction
5
The Solution Ability to impact project cost Cost associated
with change Traditional Design Process Preferred Design Process EFFORT EFFECT Greatest ability to make changes at the lowest cost PD SD DD CD PR CA OP TIME Original Graphics: Patrick MacLeamy AIA/HOK
6
The Solution Rethinking: Process
How and why do we do things the way we currently do them Content When we provide deliverables, what are our assumptions Technology What tools do we use and when do we use them
7
Collaboration vs. Integration
8
Collaboration Earlier involvement of all participants
Sharing data between disciplines in a data-centric environment Consensus docs only partially align the participants The disciplines are not motivated to make long-term investments
9
Integration Based on sharing knowledge across disciplines in a knowledge-centric environment Investing in improvements unrelated to specific projects Teams stay together over many projects Each discipline develops a deeper understanding of the other disciplines
10
Delivering a better value through Integration vs. Collaboration
$9.48/bldg. sf for skin $9.73/bldg. sf for skin 42% precast, 58% glass 66% precast, 34% glass
11
Better value through Integration
$76.07/sf Shell Bldg. Cost $72.10/sf Shell Bldg. Cost
12
Collaboration vs. Integration
Project Schedule from programming to commissioning
13
A recent completion using an integrated approach
R square > 66% A recent completion using an integrated approach
14
Some Key Aspects of Integration
Contractual barriers must be removed Knowledge in the supply-chain is “pulled up” into the initial design process…sole-sourcing Disciplines must merge in order to: take contractual responsibility for each other create the incentive to invest in process improvement
15
Content
16
Develop content that serves the need of all project participants
Aligning Content Keeping the end goal in mind Architect General Contractor Develop content that serves the need of all project participants
17
Technology
18
What is BIM? AIA’s A Simple Working Definition
19
A BIM Strategy Revit Navisworks DProfiler Innovaya Timberline CMIC
Conceptual SD DD CD CA Construction Revit Navisworks DProfiler Innovaya Timberline CMIC Advisor
20
Building Information Modeling Construction Documents
If? How? Planning Phase Conceptual Phase Schematic Phase Design Development Construction Documents Construction Phase Macro Model DProfiler Revit Bentley Architecture ArchiCad Micro Model
21
Macro BIM Simple Images Geo referenced Models Cost Estimate
Scope Criteria Building Codes Geo referenced Models Cost Estimate Simple Images Energy Analysis Pro Forma
22
Demo Start with as little or as much data available
23
Examples
24
Government
25
Hospitality
26
Retail
27
Mid-Rise
28
Benefits
29
Construction Documents
Where should value engineering occur? Rework Rework Conceptual Phase Schematic Phase Design Development Construction Documents Bid Phase Construction Phase
30
Defined Project Scope
31
Provide Project Alternatives
Alternatives can be evaluated to provide real-time cost comparisons of building envelopes, MEP systems, structural systems, levels of interior finish out, alternate sites, different parking ratios and landscaping proportions. Granite and Glass Cladding Glass and Spandrel Glass Cladding
32
What-Ifs Tilt-up Precast Precast and Masonry Curtainwall
33
92% man hour reduction 1% delta in accuracy
Fast, Reliable, & Defendable Results Traditional Estimating 240 Hours (2 estimators 120 hrs) Deliverable: project cost estimate vs. DProfiler 20 Hours Deliverable: project cost estimate, and Project Proforma Design Criteria Document Three-Dimensional Model 92% man hour reduction 1% delta in accuracy
34
Benefit: Capturing Knowledge
Capture and reuse of industry experience and knowledge. All employees can leverage company knowledgebase and be productive.
35
Conclusion www.beck-technology.com Technology, Content and Process
BIM can add value at all phases of a project BIM can be used on all types of building Faster, Cheaper and Better
36
Q & A Contact Info Stewart Carroll Beck Technology (214) Direct
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.