Presentation is loading. Please wait.

Presentation is loading. Please wait.

Status of Transport and Handling Contract

Similar presentations


Presentation on theme: "Status of Transport and Handling Contract"— Presentation transcript:

1 Status of Transport and Handling Contract
S. Prodon – LEAF

2 Contract Situation End of DBS contract (S090/TS): 30.09.2008
New contract as from Adjudication criteria : Best Value for Money To be approved by FC September

3 Implementation of new transport contract
General safety documents and training in preparation Validation of the salary grid by DBS “Comité d’Entreprise” Interview of all DBS personnel as from mid August (depending on holidays planning) More than 30 persons already signed their new contract Final list mid-september Estimate number of refusal: 5 persons

4 Points pending 3 types of personnel for shut-down
Local personnel “Grand déplacé” personnel On-call contract personnel Hourly rates still to be re-negociated

5 Support for experiments
During operation: average team of 2 persons 1 person paid by TS-HE-HH 1 person paid by experiments Dispatched according to EDH received During shut-down (first estimate): Team of 4 persons / experiment Duration: January – mid May

6 Financial Aspect New contract more expensive than existing DBS contract Shut-down hourly rates still to be re-negociated To be presented on a next LEAF

7 Status of Cherry Pickers Renting Contract
S. Prodon – LEAF

8 Contract implementation
Cherry pickers renting contract in place as from If renting before this date, possibility to benefit from contract hourly rates Renting procedure in progress Insurance with Legal Service Driving authorisations with SC


Download ppt "Status of Transport and Handling Contract"

Similar presentations


Ads by Google