Download presentation
Presentation is loading. Please wait.
Published byCandice Allen Modified over 6 years ago
1
DT-PO Section Meeting Tuesday 30th June , 15:00 Hrs, room 155-R-047
Agenda News from DT Participation to Catia WG (GUC) and PO involvement (Christophe) Reverse engineering activity status (Christophe) Tour de table (all - 5 min. each)
2
DT personnel matters Didier Gabriele (designer, started on 1 May, before ALICE) ALICE infrastructure AEGIS AX-PET Olivier Jamet (designer, will start in DT on 1 July, before LHCb) LHCb infrastructure … Georg Nuessle (PhD student in engineering on Na62 Gigatracker) DCRB: Results of several boards published (1 slot – 1 candidate, appl. Phys., negative cases of secretaries boards). No results yet for designers and computing engineers. Will only be published in July. Cooling activities (Paolo): 2 posts published for cooling coordinators within DT 2 fellows, will start in coming weeks/months DAGUIN, Jerome , Det. Cooling, supervisor P. Petagna ZWALINSKI, Nicolas, Det. Cooling, supervisor P. Petagna
3
Other communications Future Section meetings with presentations on activities by PO members 102 ventilation system on roof - safety contacted: Need noise measurements to be done by Christian Bernard/EN Need environmental measurements by Sonja Kleiner DG/SCI Holidays period: \\cern.ch\dfs\Departments\PH\Groups\DT\PO Status Euclid-Catia conversion: models transferred (manually and automatically) need now: to be found (which version: by the responsible designer), checked, re-assembled, properly linked in Smarteam from the conversion bin to project folders). Requests for draftsman efforts (execution drawings) ?
4
2009 MARS exercise, official results
PH step distribution 2009 P P P P+3
5
Resource allocation
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.