ROADS & HIGHWAYS PROJECTS THANDLA-LIMDI (BOT ANNUITY) MADHYA PRADESH State: Madhya Pradesh Client: Gangorti Enterprises Ltd., Scope of Works Topographical & Geotechnical Survey Design of Road Highway, Pavement & Bridge. Traffic Survey Construction Supervision Status: Completed (Feb. 2014) Salient Features: Length of Road: Kms Major Bridge- 1 Nos Minor Bridge- 3 Nos. Project Cost: Crores JHABUA-JOBAT-ZEERAPANYA-BAGH-KUKSHI, (BOT TOLL BASIS) MADHYA PRADESH State: Madhya Pradesh Client: Gangorti Enterprises Ltd., Scope of Works Topographical & Geotechnical Survey Design of Road Highway, Pavement & Bridge. Traffic Survey Construction Supervision Status: Completed(June 2014) Salient Features: Length of Road: Kms Major Bridge- 3 Nos. Minor Bridge-5 Nos. Project cost: Crores Toll Plaza
2
DEHARDHA-ISHAGARH (BOT ANNUITY), MADHYA PRADESH
COMPLETED ASSIGNMENTS ROADS & HIGHWAYS PROJECTS DEHARDHA-ISHAGARH (BOT ANNUITY), MADHYA PRADESH State: Madhya Pradesh Client: Gangorti Enterprises Ltd., Scope of Works Topographical & Geotechnical Survey Design of Road Highway, Pavement & Bridge. Traffic Survey Status: Completed Salient Features: Length of Road: Kms Major Bridge- 2 Nos. Minor Bridge-4 Nos. Project cost: Crores DPR OF 150 KMS. PMGSY ROAD FOR GAYA & AURANGABAD DISTT. IN THE STATE OF BIHAR UNDER PMGSY State: Gaya & Augangabad, Bihar Client: IL&FS Scope of Works Topographical & Geotechnical Survey Design of Road Highway, Pavement & Bridge Traffic Survey Status: Completed(Dec.2012-Jan. 2014) Salient Features: Length of Road: 150 Kms 15 Nos. of Major Bridges Length: 1483M Project cost: 0.45 Crore
3
COMPLETED ASSIGNMENTS
ROADS & HIGHWAYS PROJECTS DPR OF 415 KMS. PMGSY ROAD FOR BRRDA IN THE STATE OF BIHAR State: Darbhanga & Buxar Distt., Bihar Client: Bihar Rural Road Development Agency Scope of Works Topographical & Geotechnical Survey Design of Road Highway, Pavement & Bridge Traffic Survey Status: Completed (Oct Aug 2014) Salient Features: Length of Road: 415 Kms Darbhanga (295Kms) & Buxar (120Kms.) Project Cost: Crores DPR OF 407 KMS. MMGSY ROAD FOR BRRDA IN THE STATE OF BIHAR State: Madhubani Distt., Bihar Client: Bihar Rural Road Development Agency Scope of Works Topographical & Geotechnical Survey Design of Road Highway, Pavement & Bridge Traffic Survey Status: Completed (May Dec 2014) Salient Features: Length of Road: 407 Kms - Jainagar Division:109.7Kms - Phulparas Division:56.52Kms - Jhanjharpur Division: 68.71Kms - Madhubani Division:114.7Kms - Benipatti Division:57.12Kms Project Cost: Crores
4
COMPLETED ASSIGNMENTS
BUILDING PROJECTS NEW OFFICE BUILDING FOR PUNJAB & SIND BANK , AMBALAL DOSHI MARG, MUMBAI State: Mumbai, Maharashtra Client: Greenarchers Pvt. Ltd. Scope of Works Detailed Architectural Planning Structural Design Utilities Design Project Management Status: Completed (Oct Oct. 2014) Salient Features: Basement+G+1 Structure Built up area: 2000 Sqm. Project cost: 4.23 Crores CONSTRUCTION OF BANK BUILDING IN SECTOR-49 & 63, NOIDA (U.P) FOR PUNJAB & SIND BANK ON DESIGN & BUILD PATTERN State: Noida, UP Client: Greenarchers Pvt. Ltd. Scope of Works Detailed Architectural Planning Structural Design Utilities Design Project Management Status: Completed (Oct Oct. 2015) Salient Features: Basement+G+4 & 5 Structure Project Cost: INR 960 Lacs Built up area: 1338 Sqm.
5
ONGOING ASSIGNMENTS ROADS & HIGHWAYS PROJECTS S.N. PROJECT SUMMARY
NAME OF CLIENT 1. Independent Engineer services for 4-Laning of Rohtak-Jind Section from km to km of NH-71 and connecting link from km of NH-71 to km of NH-71A in the State of Haryana on BOT (Toll) on DBFOT basis under NHDP Phase III. Length of Road: 48.6Kms, 4-Lane Project Cost: Crores National Highways Authority of India 2. Independent Engineer services for Operation and Maintenance of Kota-Baran section Km to Km of NH-76 in the state of Rajasthan on OMT basis (Package-8) Length: Kms. Length of Road: Kms 3. Preparation of DPRs of 100 Kms. MMGSY Road in Champaran Distt. (Areraj & Motihari Division) for BRRDA Project under World bank funded. Length of Road: Kms Bihar Rural Road Development Authority (BRRDA) 4. Preparation of DPR of 147 Kms. MMGSY Road in Madhubani District in the State of Bihar for BRRDA. Length of Road: Kms 5. Road Safety Consultancy services for Re- Alignment of NH-37 from Bogibeel junction at Km to Km under SARDP-NE in the State of Assam (Dibrugarh bypass) Length of Road: Kms. JKM Infra Works Pvt. Ltd. Assam 6. Road Safety Consultancy services for Widening & Strengthening of NH-65 to 4-Lane with paved shoulders from exisitng Km to Km (Netra village to Mandore section) in the state of Rajasthan on EPC mode basis. Length of Road: 30 Kms. Gasnnon Dunkerley & Co. Ltd. Ahmedabad Building Projects: 7. Detailed Engineering and consultancy services for the works “Up gradation/ Renovation of 9 Nos. of Government Degree College” of Higher Education Department of Uttarakhand Government. Detailed Engineering Design Project Cost: Crores NPCC Ltd. Dehradun
6
Project Management Services
ONGOING ASSIGNMENTS 8. Detailed Engineering and consultancy services for the works “Construction of G.B. Pant, Library & Museum buildings at Khoont, Almora for Cultural Department, Govt. of Uttarakhand. Detailed Engineering Design Project Cost: 1.25 Crores NPCC Ltd. Dehradun 9. Detailed Engineering and consultancy services for the works “Construction of Late Ram Singh Dhoni Ashram and Library building at Jainti, Almora for Cultural Department, Govt. of Uttarakhand. Project Cost: 2.00 Crores 10. Project Management Services for Repairs, Strengthening & Renovation works of existing 2-Blocks building (Stilt+6 Storey each) of SBI at Wadala, Mumbai Project Management Services Built up area: Sqm. Project Cost: 4.27 Crores Greenarchers Pvt. Ltd.