Download presentation
Presentation is loading. Please wait.
1
L-Band Experimental Authorization
4
Date: November 16, 2006
5
Experiment: L-band at End Station B
6
NLCTA Safety Officer: Keith Jobe
9
Experimental Authorization Valid
From – 11/01/2006
10
To – 05/31/2007
11
1. Description of this experiment
12
2. Sketch of device or system indicating locations of radiation sources and proposed shielding for initial operation:
13
3. Brief description of the expected radiation production
3. Brief description of the expected radiation production. Identify shielding to address this source:
14
4. Discussion of the maximum radiation produced under Operating Conditions:
15
5. Discussion of the maximum radiation produced under Fault Conditions:
16
6. Does the device or system present any unusual radiation sources or hazards? Please explain unusual sources and related controls.
17
7. Description of the initial requirements for shielding:
18
8. Description of shielding upgrade options (discuss locations and type of shielding modifications considered likely):
19
9. Run up and Operation plan
9. Run up and Operation plan. Indicate hold points for radiological surveys and subsequent survey frequency:
20
All survey sheets are filed in the NLCTA Radiation Survey Binder in the NLCTA control room.
21
10. Specific plan of Radiation Measurements.
22
11. Radiation Engineering Controls.
23
12. Radiation Procedural Controls.
24
13. Radiation Passive Monitors
25
14. Envelope of Global Operating Parameters not to be exceeded (operating safety envelope)
26
15. Experiment operators:
27
16. Operation of the L-band system
28
17. Operational Requirements:
29
18. Document Approvals: