CHOOSING THE BEST TECHNOLOGY
IBTUF V CHOOSING THE BEST TECHNOLOGY
2
Does One Size fit ALL?
3
THE CHOICES
4
COMPARISONS
5
Keeping pace with the Changes
OUR CHALLENGES Keeping pace with the Changes New Equipment New Manufacturers New Spectrums New Technologies New Tools Required Understanding the needs The Service Providers The Venue Avoiding the “Comfort Zone” Remaining “Technology Agnostic”
6
A Neutral Approach Weighting Preferred Create a Matrix Important
Ranking the Equipment is done relative to the needs of your customers. Weighting Preferred Important Required Create a Matrix Product Score Fails Below Average Average Above Average Excellent
7
UNIVERSITY CAMPUS NEUTRAL HOST DAS PROJECT NEW CONSTRUCTION
EXAMPLE UNIVERSITY CAMPUS NEUTRAL HOST DAS PROJECT NEW CONSTRUCTION
8
Design Approach A Phased Approach
Phase I: High Power Outdoor Nodes Designed to provide ALL required outdoor coverage and have the highest possible impact on indoor coverage needs Phase II: In-Door Reinforcements including Public Safety DAS Head End Location Campus MDF (Central To Fiber Plant) WSP Signal Source Remote from DAS Head End OSP Fiber: Provided by Venue from DMark to DMark
9
Design Block Diagram
10
Spectrum’s & Technologies
Public Safety WSP Spectrums & Technologies AT&T 700MHz – LTE Cell A – GSM & UMTS PCS C4, D – GSM & UMTS AWS Sprint 800/900MHz – iDEN/SMR PCS B – CDMA 2700MHz – WiMax T-Mobile PCS A – GSM Verizon Wireless Cell B – CDMA/1x-EvDo PCS E – 1xEvDo
11
Equipment Considerations
Campus Specific Needed to support all of the waveforms and technologies as listed (VHF, UHF, 700(LTE), CELL, PCS, AWS, WiMax ) Required both High Power Outdoor and Low/Medium Power Indoor modules Minimize DAS Footprint (Head End and Remote Space Restrictions) Support Build Requirements Remote BTS Centralized Head End Multiple Coverage Locations WSP Desires & Considerations Minimize the number of Deployed Technologies Conserve OSP Fiber Separate Paths OR Partitioned Paths
12
Selecting the Technology
No Single Technology Will Do It All !
13
Selecting the Technology
Two Approaches Emerged Layer 1 = Outdoor Layer 2 = Indoor Layer 1 = WSP’s Layer 2 = PS Our Recommendation A for WSP’s and E for PS
14
INTERNATIONAL AIRPORT NEUTRAL HOST DAS UPGRADE PROJECT
EXAMPLE INTERNATIONAL AIRPORT NEUTRAL HOST DAS UPGRADE PROJECT 14
15
The Issues RISK Existing DAS is no longer supported
Spares are not available No Technical or Repair Services are available This is a disaster just waiting to happen! Can’t support Growth Wasn’t able to support entire initial DAS Deployment No power to support additional channels and capacity needs Doesn’t support 4G Technology System is under powered in existing configuration!
16
Key Considerations Scalability The new equipment needed to be able to support (1) ALL currently deployed technologies, spectrums and channel counts, (2) channel/spectrum growth to support capacity needs and (3) addition of future 4G Technologies Fiber Count We looked for technologies that would not exceed the current fiber availability between the Head End Compound and the Remote Head End. Cabling and Link Budget To avoid the high cost of conduit, we looked for technologies that would be able to use the existing “grandfathered” cabling structure while improving the existing Link Budgets. Schedule Speed is of the essence in eliminating the risk of catastrophic system failure.
17
A 2 Phased Approach PHASE I
Rapid deployment of an equipment change-out for the existing services. Eliminate the Risk of Equipment Failure Improve the existing Link Budgets / System Performance Addition of Capacity Should be handled as a maintenance/repair issue since it is equipment only – no cabling. PHASE II Addition of Equipment and Infrastructure to support 4G Process will require “Full Scale” Design, Engineering, Review, Permitting, Deployment, Optimization & ATP Services Will require additional cabling/conduit layer(s) and Antennas
18
The Existing Infrastructure
24 Strands of SM Fiber from the Compound to Terminal C 12 Strands of SM Fiber to each Remote 3 Sector Design Each Remote has 6 Coax Ports 4-Low and 2-High
19
Spectrum’s & Technologies
PHASE I PHASE II
20
Scoring Results ONLY 3 TECHNOLOGIES FIT THE EXISTING CABLE ARCHITECTURE
21
INTERNATIONAL AIRPORT NEUTRAL HOST DAS NEW CONSTRUCTION
EXAMPLE INTERNATIONAL AIRPORT NEUTRAL HOST DAS NEW CONSTRUCTION 21
22
Venue Considerations Include Public Safety, WiFi n in non-public space No Outdoor – high power Indicate if analog signal is going to ride on SM fiber Limited Head End and Remote Closet Space Very few IDF/Closets spaced far apart Airport Operates 24/7 UPS Power requirement (KVA load) including back-up batteries Cooling requirement at Head End Airport will own the system Verizon Wireless Confidential and Proprietary Information. Not to be disclosed by LAWA outside of those LAWA employees or agents who have a need to know to conduct an evaluation of the information 22
23
E911 & LTE MIMO Planning Enhanced Positioning
911 Mandates assessed at the County Level We propose DAS based technology using Co-Pilot Beacons for CDMA systems and LMU’s for GSM systems to facilitate location accuracy to the building of call origin. LTE MIMO VzW is planning the first launch of a 4G LTE Network in the US; this technology embraces a MIMO feature. MIMO requires twice the passive infrastructure of SISO / traditional DAS deployments. MIMO throughput benefit is not known as a function of IB Morphology Types or Antenna configurations. VzW LTE MIMO deployments in the 700 MHz band require special/proprietary survey techniques before they can be justified. Verizon Wireless Confidential and Proprietary Information. Not to be disclosed by LAWA outside of those LAWA employees or agents who have a need to know to conduct an evaluation of the information 23
24
Performance Criteria Verizon Wireless Confidential and Proprietary Information. Not to be disclosed by LAWA outside of those LAWA employees or agents who have a need to know to conduct an evaluation of the information 24
25
Link Budget Consideration for existing noise floor and additional DAS created noise is essential in the Design and Deployment phases Verizon Wireless Confidential and Proprietary Information. Not to be disclosed by LAWA outside of those LAWA employees or agents who have a need to know to conduct an evaluation of the information 25 25
26
Scoring Results
27
Our Task Stay Informed Know what’s coming from the WSP’s
Know what the DAS Manufacturers are offering today AND tomorrow Understand the Project Needs How to take advantage of what the Venue has to offer How to avoid the sensitive or restrictive Venue Elements What the TOTAL technology needs are for both the Venue and the WSP’s Provide an Objective Evaluation of the available DAS choices
28
Thank You Kern Davis TIME COST QUALITY
Communication Technology Services, LLC Major Accounts Manager Mobile COST TIME QUALITY