Basic Training Tile Laying System MUREXIN AG / Michael Maier
Version: Oktober 2007
2
Tile Laying System Preparation
3
TLS - Preparation Penetrating Primer LF for absorbent substrates
ready-to-use one component solvent free Consumption: appr. 0,15 kg/m² Delivery units: 1 and 5 kg Drying time: approx 30 minutes Application: with brush, roller
4
TLS - Preparation Penetrating Primer LF 1 – Application:
5
TLS - Preparation Penetrating Primer LF 1 – Application:
6
TLS - Preparation Penetrating Primer LF 1 – Pull off strength:
without Penetrating Primer LF 0,45 N/mm² with Penetrating Primer LF 1,15 N/mm²
7
TLS - Preparation Sealing Compounds for indoor and outdoor use
for indoor use Liquid Sealing Compound 1KS Liquid Sealing Compound 2 KS Sealing Compound DF 2K Profi Sealing Compound PD1K
8
TLS - Preparation Liquid Sealing Compound 1 KS
seam- and jointless sealing compound protect against pressureless water Solvent free one component only for indoor use Consumption: appr. 1,5 kg/m²/mm Delivery units: 7, 14 u. 25 kg Application: roller, trowel, Drying time between 1st and 2nd layer: 1 hour Drying time between 2nd layer and tiling: appr. 3 hours
9
TLS - Preparation Sealing Compounds – System components
Sealing Collars DZ 35 / DZ 70 Sealing Tape DB 70 10 and 50 lfm per roll Sealing Corners
10
Tile Laying System Application
11
Application Liquid Sealing Compound – Application:
Penetrating Primer LF 1 (drying time approx 30 minutes)
12
Application Liquid Sealing Compound – Application: 1st step
Fix the Sealing Ribbon DB 70 in the corners Apply liquid sealing compound 1 KS with roller or trowel only in the corner (with approx 10 cm) and fix the sealing tape into the fresh insulation. Same process with the sealing collars
13
Application Liquid Sealing Compound – Application:
Liquid Sealing Compound 1 KS Application with roller
14
Application Liquid Sealing Compound – Application:
Liquid Sealing Compound 1 KS
15
Application Liquid Sealing Compound – Application:
16
Application Liquid Sealing Compound – Application:
17
Application Liquid Sealing Compound – Application:
18
Timetable Product applying with Penetrating primer LF 1 roller, prush
Drying time approx 30 minutes 1st layer liquid sealing compound 1 KS roller, trowel, Drying time approx 1 hour 2nd layer liquid sealing compound 1 KS roller, trowel, Drying time approx 3 hours Tiling with Flex Tile Adhesive f. e. Murexin Flex tile adhesive KGF 65, C2 TE, s1