RTK Contractor Management Process Book
“White Book” Quick Reference
3
Master Contact List A pocket card and project book sheet that contains the names and phone numbers of people to contact when an issue arises on a job or project To give Contractors a consolidated, focused list to expedite issue resolution
5
Pre-Scoping To ensure the job’s value Setting Boundary
Understanding Need Defining Work Elements/Deliverables Identifying Resources Identifying Risks and Hazards To understand who’s doing what, when, and to reduce risk of failure Assigning Responsibility Resolving Schedule Conflicts Scheduling Work Protecting the Plan
7
Scope of Work Outlining the division of contractor work and contractor responsibilities, and preparing the SHEA To identify and communicate the work and its risks Breakdown the work into manageable elements
9
Resource Identification
Estimating resources needed to produce each major deliverable To avoid future resource problems and help assign responsibility For each element/deliverable, ask: What knowledge and skills are needed? What facilities are needed? What equipment is required? What supplies or materials will be used? What special or unusual resources are needed? Document type, amount, and cost for each resource Look at CONTRACTOR resources and KUC resources
11
SHEA / P To ensure contractor safety related to area hazards and potential known work hazards RTK identifies work area hazards and potential known work hazards, PPE and Special Permits related to work break down Contractor provides plan to address hazards and requirements
13
Risk Assessment Focus on tasks specific to work being performed by contractor To ensure contractor safety when performing work tasks Contractor identifies tasks and risks associated with each task Contractor provides current risk level assessment, mitigating actions and resultant risk level assessment Must be done jointly by RTK and Contractor Utilize CRM on controls
15
Potential Problem Analysis (PPA)
A systematic process for protecting actions or plans To ensure the intended value of the project is not jeopardized and to avoid being reactive Identify potential problems Identify likely causes Take preventive action Plan contingent action and triggers
17
Supporting Documents All other documents that are needed to help the contractor achieve the goal CRM Checklists Drawings Inspection forms Applicable standards Guiding documents
19
Issue Resolution Driving resolution to the lowest appropriate level without impacting safety, work, budgets or schedules To allow contractor overseers to manage their time more effectively To document issues discussed and approved Documented management of change orders
21
Pre-Job Reviewing safety planning and ensuring contractor(s), customer, and contract administrators/project engineers are ready to begin To ensure KUC’s safety values and expectations are clearly understood Review schedule Review SHEAP, relevant RAs, and PPA activities Review daily communication expectations Review Master List/escalation protocol Checklist Pre-job walk through if needed To check that contractor understands RTK standards and have controls in place prior to work starting
23
Project Commercial Terms
Identify GBS Business Partner for contract Clarify key commercial terms and restrictions on specific purchase orders related to project Understand billable items such as: Labor Equipment Materials Mob / De-Mob
25
Contractor Engagement Plan
Understand level of engagement needed for Contractor specific to job / project Drive consistency of engagement at each level Continual clarification of expectations and progress against expectations