Presentation is loading. Please wait.

Presentation is loading. Please wait.

Disabled Adult Transit Service:

Similar presentations


Presentation on theme: "Disabled Adult Transit Service:"— Presentation transcript:

1 Disabled Adult Transit Service:
Shift Design Optimization and Demand Forecasting Team: Mike Clay Yvan Fortier Chris Samuel

2 Agenda PART A: Shift Design Optimization Problem Solution Methodology
Analysis Results Risk PART B: Demand Forecasting Problem Solution Methodology Analysis Risk Results Problem – Solution – Methodology – Analysis – Results - Risks

3 Executive Summary

4 Executive Summary: Part A
Part-Time Shifts Full-Time Shifts Daily Cost and An increase in the amount of part time shifts and less full time shifts will reduce overtime hours paid out. It will be effective in reducing daily operator cost while still meeting same level of demand Productivity

5 Executive Summary: Part B
1. Redirecting 2. Optimizing 3. Centralizing Cost Containment Strategies: Operating Expenses: 197% Number of Employees: 268% Number of Vehicles: 215% Demand for DATS: 234% Forecast:

6 Shift Design Optimization
Part A: Shift Design Optimization

7 Problem

8 Review the Effectiveness Overtime Reduction Perspective
Problem Review the Effectiveness of Part-Time Shifts Maintain or Increase Service Level with a Greater Mix of Shifts Overtime Reduction Perspective in Reducing Daily Operator Cost Problem – Solution – Methodology – Analysis – Results - Risks Problem – Solution – Methodology – Analysis – Results - Risks

9 Solution

10 Solution Problem – Solution – Methodology – Analysis – Results - Risks
Minimize Labour Cost Increase Operator Utilization Optimal Shift Design Model Efficacy of Part-Time Shifts Minimize labour cost and increase/maintain operator utilization Lowering workers scheduled during peak times Problem – Solution – Methodology – Analysis – Results - Risks Problem – Solution – Methodology – Analysis – Results - Risks

11 Methodology

12 Methodology Shift Scheduling Model built in Excel
Queueing ToolPak (QTP) Review Current Shift Schedule Demand Supply Constraints Utilization Input Various Shift Combinations Cost Benefit Analysis Excel based model Queueing toolpak Cost benefit analysis of current shift design vs potential shifts Problem – Solution – Methodology – Analysis – Results - Risks Problem – Solution – Methodology – Analysis – Results - Risks

13 Analysis

14 Daily Wheelchair Demand
Problem – Solution – Methodology – Analysis – Results - Risks

15 WC Demand vs. Scheduled Operators
1.9872… Problem – Solution – Methodology – Analysis – Results - Risks

16 FT Shifts vs. PT Shifts 10.61% of staff PT.. 14 of 132 Problem – Solution – Methodology – Analysis – Results - Risks

17 Current Operator Utilization
Avg 56%, max 126, min 5% Problem – Solution – Methodology – Analysis – Results - Risks

18 Monthly OT Costs ( ) Problem – Solution – Methodology – Analysis – Results - Risks

19 Results

20 Results Problem – Solution – Methodology – Analysis – Results - Risks
Current = 62 8, 17 10, 9PT ………FT <79… , 45, 8, 8 5…83tot Problem – Solution – Methodology – Analysis – Results - Risks

21 Utilization: Old vs. New
Avg 56%, max 126, min 5% Newbies- avg 61%. Not as steep of slope, smoothed Problem – Solution – Methodology – Analysis – Results - Risks

22 Chosen Shift Blend Maximum daily cost savings of $1093. savings of nearly $560 ($ yrly)…. Employ 10 less ppl on an avg basis…..Raise wages by 3.92%, $14,258.28 $14,052.98 Problem – Solution – Methodology – Analysis – Results - Risks

23 Risks

24 Risks Higher utilization = More work for operators
decreased worker quality of life Average trips made per shift will decrease Employees prefer full-time shifts and overtime hours Problem – Solution – Methodology – Analysis – Results - Risks

25 Part B: Demand Forecasting

26 Problem

27 Problem Population of Edmonton: increasing changing Demand for DATS:
Resulting in: planning challenges fiscal constraints Requiring: forecast of future demand forecast of impacts Problem – Solution – Methodology – Analysis – Risks – Results

28 Solution

29 Solution Cost Containment Strategies Population of Edmonton:
age gender Disabled Population of Edmonton Impacts on DATS: vehicles employees operating expenses Demand for DATS Cost Containment Strategies Problem – Solution – Methodology – Analysis – Risks – Results

30 Methodology

31 Methodology Forecasting the Population of Edmonton
Disabled Population of Edmonton Forecasting the Demand for DATS Forecasting the Impacts on DATS Drivers of Disability Problem – Solution – Methodology – Analysis – Risks – Results

32 Analysis

33 Population of Edmonton
Growth: total = 29% 65+ = 99% Growth: total = 1% 65+ = 4% Growth: total = 17% 65+ = 93% Historical: Forecast: Problem – Solution – Methodology – Analysis – Risks – Results

34 Disabled Population of Edmonton
Growth: total = 72% 65+ = 133% Growth: total = 62% 65+ = 125% Growth: total = 24% 65+ = 31% Historical: Forecast: Problem – Solution – Methodology – Analysis – Risks - Results

35 Demand For DATS Growth: total = 256% 65+ = 460% Growth: total = 234%
65+ = 422% Growth: total = 167% 65+ = 302% Historical: Forecast: Problem – Solution – Methodology – Analysis – Risks - Results

36 Number Of Vehicles Growth: 235% Growth: 29% Growth: 215%
Historical: Forecast: Problem – Solution – Methodology – Analysis – Risks - Results

37 Number Of Employees Growth: 293% Growth: 66% Growth: 268%
Historical: Forecast: Problem – Solution – Methodology – Analysis – Risks - Results

38 Total Operating Expenses
Growth: 215% Growth: 52% Growth: 197% Historical: Forecast: Problem – Solution – Methodology – Analysis – Risks - Results

39 Risks

40 Demand For DATS Average Range = 29% Average Range = 29%
Problem – Solution – Methodology – Analysis – Risks – Results

41 Number Of Vehicles Average Range per Range in Demand = 0.95
Problem – Solution – Methodology – Analysis – Risks - Results

42 Number Of Employees Average Range per Range in Demand = 1.08
Problem – Solution – Methodology – Analysis – Risks - Results

43 Total Operating Expenses
Average Range per Range in Demand = 0.90 Average Range per Range in Demand = 0.90 Problem – Solution – Methodology – Analysis – Risks - Results

44 Results

45 Results Cost Containment Strategies Redirecting to Optimizing shift
schedule Redirecting to other assisted transportation services Cost Containment Strategies Centralizing pick-ups and drop-offs Problem – Solution – Methodology – Analysis – Risks – Results

46 Key Findings

47 More PT Key Findings – Part A Less OT
Higher Utilization With a greater balance of PT and FT shifts, OT will be reduced Demand will be more effectively met from a cost perspective with the same service level

48 Key Findings – Part B Demand for DATS will grow significantly:
234% - 256% Will cause significant impacts: operating expenses increase by: 197% - 215% Can be managed with cost containment strategies: redirecting optimizing centralizing

49 Questions

50 Appendix

51 Appendix – Part A Threshold Time – 30 min Service Level - .99
Arrival Rate – Demand from 2 periods ahead averaged Service Rate* – per hour per quarter hour Queue Capacity – infinite Lagg SIPP (stationary independent period by period) approach MMS – Poisson Distribution, inter-event times (no exact info about next pickup) *Service Rate = average(total passengers carried per operator / hours worked by operator)

52 Appendix – Part A ASSUMPTIONS Demand = SCHED_WC – CANCEL_WC
Demand broken down into weekday and weekend demand No break time. Only current shift schedule includes split shifts Tours 0.5hrs than actual length

53 Appendix – Part A CONSTRAINTS 10 PT per day Avg. Wage

54 Appendix – Part A Labour Costs Different Costs of Shift Combinations

55 Appendix – Part A

56 Appendix – Part A

57 Appendix – Part B: Data Limitations and Assumptions
Profiled only by age, not also by gender No data on disabled population of Edmonton Data only on disabled Alberta for 2001 and 2006 Two data sets are insufficient for MVR Two data sets only allows forecasting by SLR DATS only tracks registered clients, not inquiries Two data sets are insufficient for MVR Two data sets only allows forecasting by SLR Assumed: only cost driver is number of clients no intervention by decision makers no changes in productivity


Download ppt "Disabled Adult Transit Service:"

Similar presentations


Ads by Google