1 Status Reports (STF 213, MTS-IPT, STF 236) and Info (STF 219, STF 224)
Anthony Wiles MTS#36 Budapest, March 2003

2 STF 213 TTCN-3 Edition 2 STF 213 Closed December 2002
On time, on budget Parts v2.2.1 now published PTCC web updated as requested by MTS#35 Part 6 (TCI) to be approved at this meeting (Ina) CR process being managed on an 'emergency' basis All CRs, status ( ), living list etc. on PTCC website Need to discuss new STF - June 2003 (?) and 2004 When do we decide to hav next revision (2.3.1, 3.1.1)? Training material (approval): Gyorgy (voluntary work) New Rapporteur (Gyorgy/Sarolta?) TTCN-3 promotion activities? MTS#36, Budapest, March 2003

3 EP TIPHON (DTS/00065-1,2,3 R4) STF 213 and STF 224
STF 224: Generic approach to interoperability testing Methodology Terminology Abstract test architectures (general model which resolves to special cases) Test development process (using simple UML) Testing process (also in UML) Assumes conformance testing been done previously Installed an experimental SIP-H.323 test bed at ETSI Voluntary equipment from various vendors Gatekeepers, Gateways, IWF, SIP/H.323 terminals etc. STF 219: H.323-SIP Interoperability Test Scenarios Several hundred test cases; Now being aligned with the methodology (validated on test bed) MTS#36, Budapest, March 2003

4 MTS-IPT (General) Kick-off meeting held in October 2002
MTS ToR approved by Board to include these activities Info/News/Press release 1-page status input to Board#42 (MTS 36TD16) Two main activities SIGTRAN IPv6 MTS#36, Budapest, March 2003

5 MTS-IPT (SIGTRAN) Lot of interest in SIGTRAN test specifications
8 active voluntary participants (8 companies) Representatives from MTS, SPAN and IETF Plus 4 observers and 1 uncommitted (3 companies) Concentrating on M3UA and SCTP Have draft TPs (for both) Must align with SPAN's subset for SIGTRAN Hope to go to TTCN-3 for ATS Should open WI's as needed. Need 2 WIs now: TSS&TP for M3UA (main driver GN Nettest now Navtelcom) TSS&TP for SCTP (main driver TestingTech) Workplan needs to be drawn up STF not needed - all homework (coordinated by PTCC) MTS#36, Budapest, March 2003

6 MTS-IPT (IPv6) STF 236 STF 236 started work in January
Anthony Wiles (PTCC), Scott Moseley César Olivera, César Viho (voluntary), Frédéric Roudaut Max Frey (including 5 days voluntary) Steve Randall (3 days - in April for review) 75 of 87 days used with 4 days not yet assigned Major milestones 14 March: 1st Draft (OK) 1st Progress Report TD12 Mid April: 1st proposal to EC EC have changed date to end of April 25 April: TB approval request slight delay (start process end of April or even mid-May) MTS#36, Budapest, March 2003

7 STF 236 Identified Work Packages
WP1: Toolbox and Core WP2: Transitioning WP3: Mobility WP4: IPSec WP5: QoS WP6: Routing WP7: Multicast Based on areas of common interest to EC eEurope / European industry / ETSI members 3GPP (mid/end 2004) ETSI NGN (late 2004) IPv6 Forum certification scheme (2004) MTS#36, Budapest, March 2003

8 STF 236 Contents Introduction/background Basic concepts
Interested players: IETF, EC, 3GPP, ETSI TBs, IPv6 Forum etc. Basic concepts Description of each workpackage 1st shot at resource estimate (need to revise) In region of 270 man-months total (!) Can PIck-'n-Mix Lot of data! see annexes: Tables, data, lists of RFCs, 3GPP, priorities, existing test suites etc. for each package Proposal for eEurope to do ToR etc. for individual STFs not done (suggest to wait) MTS#36, Budapest, March 2003

9 STF 236 Basic Concepts Toolbox is a key concept
TTCN-3 toolkit Max will talk about this Core IPv6 protocol Other test suites based on toolbox Core part Specific part Savings Good SW engineering approach 20% per test suite Easier maintenance Adaptability/Extensibility (3GPP, SMEs, NGN etc.) MTS#36, Budapest, March 2003

10 STF 236 Basic Tasks - Core (9.2.3)
Methodology Toolbox Core protocol mechanisms Patterns Switches User guide Integration of TTCN-2/3 Core protocol test suite (conformance/IoP) Needed? Already out there with TAHI, UNH etc. But we need enough on which to build other WP test suites MTS#36, Budapest, March 2003

11 STF 236 Basic Tasks - Other Packages
Specification of Minimum Requirements Minimum RFCs Minimum reqs - like PICS Definition of Test Architecture and Methods Engineering approach Use of toolbox TPs (Reuse?) Test Suites Both Conformance and Interop test specifications Reusibility (IoP assumes test specs already exist) Validation (voluntary?) MTS#36, Budapest, March 2003

12 STF 236 Tool Support TTCN-3 will be used
Both for Conformance and Interop tests In IPv6 Forum the IoP tests are automated Existence of tool support will be essential Additional package? Voluntary? Other project (e.g., IST6 TIPI)? MTS#36, Budapest, March 2003

13 STF 236 Timelines Funding from EU not likely before Sept/October 2003
No funding from ETSI likely in 2003 If we wish to start earlier Will need to be on a voluntary basis Work anticipated to span MTS#36, Budapest, March 2003

14 STF 236 Cost sharing issues
The commission only funds 50% ETSI STF budget (FWP/PTCC) is not large Will require some voluntary activity Other projects TIPI (but also only 50%) May be possibility for 100% but the situation is unclear MTS#36, Budapest, March 2003

15 STF 236 What next - short term
Week Anthony finish TR Use of English etc. needs a thorough rationalisation (AW) Draft proposal for EC if possible Week 17 Anthony, Steve, Scott Need decision from MTS on which packages and where to place them (which projects)!! Finalise proposal for EC 3-4 pages to Gavin for the Commission ToRs for phase 1 packages (?) Approval of TR can begin after that (from week 18) MTS#36, Budapest, March 2003

16 STF 236 What next - longer term
Anthony (PTCC) can continue with proposal But not alone! Need support from MTS Full technical annex Based on data from the TR Partners!!! Resource plan (voluntary vs. funded) etc. Completed by September? MTS#36, Budapest, March 2003


Download ppt "Status Reports (STF 213, MTS-IPT, STF 236) and Info (STF 219, STF 224)"

Similar presentations


Ads by Google