Chapter 7 Demand Forecasting in a Supply Chain

Similar presentations


Presentation on theme: "Chapter 7 Demand Forecasting in a Supply Chain"— Presentation transcript:

1 Chapter 7 Demand Forecasting in a Supply Chain
7-1

2 Outline The role of forecasting in a supply chain
Characteristics of forecasts Components of forecasts and forecasting methods Basic approach to demand forecasting Time series forecasting methods Measures of forecast error Forecasting demand at Tahoe Salt Forecasting in practice

3 Role of Forecasting in a Supply Chain
The basis for all strategic and planning decisions in a supply chain Used for both push and pull processes Examples: Production: scheduling, inventory, aggregate planning Marketing: sales force allocation, promotions, new production introduction Finance: plant/equipment investment, budgetary planning Personnel: workforce planning, hiring, layoffs All of these decisions are interrelated

4 Characteristics of Forecasts
Forecasts are always wrong. Should include expected value and measure of error. Long-term forecasts are less accurate than short-term forecasts (forecast horizon is important) Aggregate forecasts are more accurate than disaggregate forecasts

5 Forecasting Methods Qualitative: primarily subjective; rely on judgment and opinion Time Series: use historical demand only Static Adaptive Causal: use the relationship between demand and some other factor to develop forecast Simulation Imitate consumer choices that give rise to demand Can combine time series and causal methods Notes:

6 Components of an Observation
Observed demand (O) = Systematic component (S) + Random component (R) Level (current deseasonalized demand) Trend (growth or decline in demand) Seasonality (predictable seasonal fluctuation) Systematic component: Expected value of demand Random component: The part of the forecast that deviates from the systematic component Forecast error: difference between forecast and actual demand

7 Time Series Forecasting
Forecast demand for the next four quarters. Notes:

8 Time Series Forecasting
Notes:

9 Forecasting Methods Static Adaptive Moving average
Simple exponential smoothing Holt’s model (with trend) Winter’s model (with trend and seasonality)

10 Basic Approach to Demand Forecasting
Understand the objectives of forecasting Integrate demand planning and forecasting Identify major factors that influence the demand forecast Understand and identify customer segments Determine the appropriate forecasting technique Establish performance and error measures for the forecast

11 Time Series Forecasting Methods
Goal is to predict systematic component of demand Multiplicative: (level)(trend)(seasonal factor) Additive: level + trend + seasonal factor Mixed: (level + trend)(seasonal factor) Static methods Adaptive forecasting

12 Static Methods Assume a mixed model:
Systematic component = (level + trend)(seasonal factor) Ft+l = [L + (t + l)T]St+l = forecast in period t for demand in period t + l L = estimate of level for period 0 T = estimate of trend St = estimate of seasonal factor for period t Dt = actual demand in period t Ft = forecast of demand in period t

13 Static Methods Estimating level and trend Estimating seasonal factors

14 Estimating Level and Trend
Before estimating level and trend, demand data must be deseasonalized Deseasonalized demand = demand that would have been observed in the absence of seasonal fluctuations Periodicity (p) the number of periods after which the seasonal cycle repeats itself for demand at Tahoe Salt (Table 7.1, Figure 7.1) p = 4

15 Time Series Forecasting (Table 7.1)
Forecast demand for the next four quarters. Notes:

16 Time Series Forecasting (Figure 7.1)
Notes:

17 Estimating Level and Trend
Before estimating level and trend, demand data must be deseasonalized Deseasonalized demand = demand that would have been observed in the absence of seasonal fluctuations Periodicity (p) the number of periods after which the seasonal cycle repeats itself for demand at Tahoe Salt (Table 7.1, Figure 7.1) p = 4

18 Deseasonalizing Demand
[Dt-(p/2) + Dt+(p/2) + S 2Di] / 2p for p even Dt = (sum is from i = t+1-(p/2) to t-1+(p/2)) S Di / p for p odd (sum is from i = t-(p/2) to t+(p/2)), p/2 truncated to lower integer

19 Deseasonalizing Demand
For the example, p = 4 is even For t = 3: D3 = {D1 + D5 + Sum(i=2 to 4) [2Di]}/8 = { [(2)(13000)+(2)(23000)+(2)(34000)]}/8 = 19750 D4 = {D2 + D6 + Sum(i=3 to 5) [2Di]}/8 = { [(2)(23000)+(2)(34000)+(2)(10000)]/8 = 20625

20 Deseasonalizing Demand
Then include trend Dt = L + tT where Dt = deseasonalized demand in period t L = level (deseasonalized demand at period 0) T = trend (rate of growth of deseasonalized demand) Trend is determined by linear regression using deseasonalized demand as the dependent variable and period as the independent variable (can be done in Excel) In the example, L = 18,439 and T = 524

21 Time Series of Demand (Figure 7.3)

22 Estimating Seasonal Factors
Use the previous equation to calculate deseasonalized demand for each period St = Dt / Dt = seasonal factor for period t In the example, D2 = (524)(2) = D2 = 13000 S2 = 13000/19487 = 0.67 The seasonal factors for the other periods are calculated in the same manner

23 Estimating Seasonal Factors (Fig. 7.4)

24 Estimating Seasonal Factors
The overall seasonal factor for a “season” is then obtained by averaging all of the factors for a “season” If there are r seasonal cycles, for all periods of the form pt+i, 1<i<p, the seasonal factor for season i is Si = [Sum(j=0 to r-1) Sjp+i]/r In the example, there are 3 seasonal cycles in the data and p=4, so S1 = ( )/3 = 0.47 S2 = ( )/3 = 0.68 S3 = ( )/3 = 1.17 S4 = ( )/3 = 1.67

25 Estimating the Forecast
Using the original equation, we can forecast the next four periods of demand: F13 = (L+13T)S1 = [18439+(13)(524)](0.47) = 11,868 F14 = (L+14T)S2 = [18439+(14)(524)](0.68) = 17,527 F15 = (L+15T)S3 = [18439+(15)(524)](1.17) = 30,770 F16 = (L+16T)S4 = [18439+(16)(524)](1.67) = 44,794

26 Adaptive Forecasting The estimates of level, trend, and seasonality are adjusted after each demand observation General steps in adaptive forecasting Moving average Simple exponential smoothing Trend-corrected exponential smoothing (Holt’s model) Trend- and seasonality-corrected exponential smoothing (Winter’s model)

27 Basic Formula for Adaptive Forecasting
Ft+1 = (Lt + lT)St+1 = forecast for period t+l in period t Lt = Estimate of level at the end of period t Tt = Estimate of trend at the end of period t St = Estimate of seasonal factor for period t Ft = Forecast of demand for period t (made period t-1 or earlier) Dt = Actual demand observed in period t Et = Forecast error in period t At = Absolute deviation for period t = |Et| MAD = Mean Absolute Deviation = average value of At

28 General Steps in Adaptive Forecasting
Initialize: Compute initial estimates of level (L0), trend (T0), and seasonal factors (S1,…,Sp). This is done as in static forecasting. Forecast: Forecast demand for period t+1 using the general equation Estimate error: Compute error Et+1 = Ft+1- Dt+1 Modify estimates: Modify the estimates of level (Lt+1), trend (Tt+1), and seasonal factor (St+p+1), given the error Et+1 in the forecast Repeat steps 2, 3, and 4 for each subsequent period

29 Moving Average Used when demand has no observable trend or seasonality
Systematic component of demand = level The level in period t is the average demand over the last N periods (the N-period moving average) Current forecast for all future periods is the same and is based on the current estimate of the level Lt = (Dt + Dt-1 + … + Dt-N+1) / N Ft+1 = Lt and Ft+n = Lt After observing the demand for period t+1, revise the estimates as follows: Lt+1 = (Dt+1 + Dt + … + Dt-N+2) / N Ft+2 = Lt+1

30 Moving Average Example
From Tahoe Salt example (Table 7.1) At the end of period 4, what is the forecast demand for periods 5 through 8 using a 4-period moving average? L4 = (D4+D3+D2+D1)/4 = ( )/4 = 19500 F5 = = F6 = F7 = F8 Observe demand in period 5 to be D5 = 10000 Forecast error in period 5, E5 = F5 - D5 = = 9500 Revise estimate of level in period 5: L5 = (D5+D4+D3+D2)/4 = ( )/4 = 20000 F6 = L5 = 20000

31 Simple Exponential Smoothing
Used when demand has no observable trend or seasonality Systematic component of demand = level Initial estimate of level, L0, assumed to be the average of all historical data L0 = [Sum(i=1 to n)Di]/n Current forecast for all future periods is equal to the current estimate of the level and is given as follows: Ft+1 = Lt and Ft+n = Lt After observing demand Dt+1, revise the estimate of the level: Lt+1 = aDt+1 + (1-a)Lt Lt+1 = Sum(n=0 to t+1)[a(1-a)nDt+1-n ]

32 Simple Exponential Smoothing Example
From Tahoe Salt data, forecast demand for period 1 using exponential smoothing L0 = average of all 12 periods of data = Sum(i=1 to 12)[Di]/12 = 22083 F1 = L0 = 22083 Observed demand for period 1 = D1 = 8000 Forecast error for period 1, E1, is as follows: E1 = F1 - D1 = = 14083 Assuming a = 0.1, revised estimate of level for period 1: L1 = aD1 + (1-a)L0 = (0.1)(8000) + (0.9)(22083) = 20675 F2 = L1 = 20675 Note that the estimate of level for period 1 is lower than in period 0

33 Trend-Corrected Exponential Smoothing (Holt’s Model)
Appropriate when the demand is assumed to have a level and trend in the systematic component of demand but no seasonality Obtain initial estimate of level and trend by running a linear regression of the following form: Dt = at + b T0 = a L0 = b In period t, the forecast for future periods is expressed as follows: Ft+1 = Lt + Tt Ft+n = Lt + nTt

34 Trend-Corrected Exponential Smoothing (Holt’s Model)
After observing demand for period t, revise the estimates for level and trend as follows: Lt+1 = aDt+1 + (1-a)(Lt + Tt) Tt+1 = b(Lt+1 - Lt) + (1-b)Tt a = smoothing constant for level b = smoothing constant for trend Example: Tahoe Salt demand data. Forecast demand for period 1 using Holt’s model (trend corrected exponential smoothing) Using linear regression, L0 = (linear intercept) T0 = 1549 (linear slope)

35 Holt’s Model Example (continued)
Forecast for period 1: F1 = L0 + T0 = = 13564 Observed demand for period 1 = D1 = 8000 E1 = F1 - D1 = = 5564 Assume a = 0.1, b = 0.2 L1 = aD1 + (1-a)(L0+T0) = (0.1)(8000) + (0.9)(13564) = 13008 T1 = b(L1 - L0) + (1-b)T0 = (0.2)( ) + (0.8)(1549) = 1438 F2 = L1 + T1 = = 14446 F5 = L1 + 4T1 = (4)(1438) = 18760

36 Trend- and Seasonality-Corrected Exponential Smoothing
Appropriate when the systematic component of demand is assumed to have a level, trend, and seasonal factor Systematic component = (level+trend)(seasonal factor) Assume periodicity p Obtain initial estimates of level (L0), trend (T0), seasonal factors (S1,…,Sp) using procedure for static forecasting In period t, the forecast for future periods is given by: Ft+1 = (Lt+Tt)(St+1) and Ft+n = (Lt + nTt)St+n

37 Trend- and Seasonality-Corrected Exponential Smoothing (continued)
After observing demand for period t+1, revise estimates for level, trend, and seasonal factors as follows: Lt+1 = a(Dt+1/St+1) + (1-a)(Lt+Tt) Tt+1 = b(Lt+1 - Lt) + (1-b)Tt St+p+1 = g(Dt+1/Lt+1) + (1-g)St+1 a = smoothing constant for level b = smoothing constant for trend g = smoothing constant for seasonal factor Example: Tahoe Salt data. Forecast demand for period 1 using Winter’s model. Initial estimates of level, trend, and seasonal factors are obtained as in the static forecasting case

38 Trend- and Seasonality-Corrected Exponential Smoothing Example (continued)
L0 = T0 = 524 S1=0.47, S2=0.68, S3=1.17, S4=1.67 F1 = (L0 + T0)S1 = ( )(0.47) = 8913 The observed demand for period 1 = D1 = 8000 Forecast error for period 1 = E1 = F1-D1 = = 913 Assume a = 0.1, b=0.2, g=0.1; revise estimates for level and trend for period 1 and for seasonal factor for period 5 L1 = a(D1/S1)+(1-a)(L0+T0) = (0.1)(8000/0.47)+(0.9)( )=18769 T1 = b(L1-L0)+(1-b)T0 = (0.2)( )+(0.8)(524) = 485 S5 = g(D1/L1)+(1-g)S1 = (0.1)(8000/18769)+(0.9)(0.47) = 0.47 F2 = (L1+T1)S2 = ( )(0.68) = 13093

39 Measures of Forecast Error
Forecast error = Et = Ft - Dt Mean squared error (MSE) MSEn = (Sum(t=1 to n)[Et2])/n Absolute deviation = At = |Et| Mean absolute deviation (MAD) MADn = (Sum(t=1 to n)[At])/n s = 1.25MAD

40 Measures of Forecast Error
Mean absolute percentage error (MAPE) MAPEn = (Sum(t=1 to n)[|Et/ Dt|100])/n Bias shows whether the forecast consistently under- or overestimates demand; should fluctuate around 0 biasn = Sum(t=1 to n)[Et] Tracking signal should be within the range of +6, otherwise, possibly use a new forecasting method TSt = bias / MADt

41 Forecasting Demand at Tahoe Salt
Moving average Simple exponential smoothing Trend-corrected exponential smoothing Trend- and seasonality-corrected exponential smoothing

42 Forecasting in Practice
Collaborate in building forecasts The value of data depends on where you are in the supply chain Be sure to distinguish between demand and sales

43 Summary of Learning Objectives
What are the roles of forecasting for an enterprise and a supply chain? What are the components of a demand forecast? How is demand forecast given historical data using time series methodologies? How is a demand forecast analyzed to estimate forecast error?