Presentation is loading. Please wait.

Presentation is loading. Please wait.

September 2005 Mesh Agenda Authors: September 2005 Date:

Similar presentations


Presentation on theme: "September 2005 Mesh Agenda Authors: September 2005 Date:"— Presentation transcript:

1 September 2005 Mesh Agenda Authors: September 2005 Date: 2005-09-21
doc.: IEEE /838r8 September 2005 September 2005 Mesh Agenda Date: Authors: Name Address Company Phone Donald Eastlake 3rd 111 Locke Drive, Marlborough, MA USA Motorola Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

2 IEEE 802.11s: ESS Mesh Networking Task Group
September 2005 doc.: IEEE /838r8 September 2005 IEEE s: ESS Mesh Networking Task Group TGs Motto: Perfection is achieved not when there is nothing left to add but when there is nothing left to take away. Garden Grove, California 19-22 September 2005 Chair: Donald E. Eastlake 3rd Technical Editor: Steve Conner – Recording Secretary: Stephen Rayment Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

3 Estimated General Flow of the TGs Meeting
September 2005 Estimated General Flow of the TGs Meeting Monday Afternoon Administrivia and Status of the Task Group Task Group Process Discussion Other Technical Presentation Tuesday Proposal Presentations Wednesday Other Technical Presentations Discussion and Votes on teleconferences/ad-hoc meetings Thursday Afternoon Summary Presentations of Proposals Ballot on proposals Donald Eastlake 3rd, Motorola

4 Monday Afternoon, 19 September 2005 Grand Ballroom A, 16:00-18:00
doc.: IEEE /838r8 September 2005 Monday Afternoon, 19 September Grand Ballroom A, 16:00-18:00 Call to Order Review of IEEE 802 and Policies and Procedures on Intellectual Property and Inappropriate Topics Manual Attendance Recording for Garden Grove Meeting Reminder concerning recording and photographs Approved Agenda Unanimously Approval of Minutes Approved Minutes of the July 2005 Meeting, 11-05/715r0, unanimously Approved Minutes of the Teleconference held 14 September 2005, 11-05/888r1, unanimously Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

5 IEEE-SA Standards Board Bylaws on Patents in Standards
September 2005 doc.: IEEE /838r8 September 2005 IEEE-SA Standards Board Bylaws on Patents in Standards 6. Patents IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. Approved by IEEE-SA Standards Board – December 2002, Reaffirmed May 2005 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

6 Inappropriate Topics for IEEE TG Meetings
September 2005 doc.: IEEE /838r8 September 2005 Inappropriate Topics for IEEE TG Meetings Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE Patent Committee Administrator at Approved by IEEE-SA Standards Board – December 2002 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

7 September 2005 Attendance Recording Sign-in sheets will be located near the “802 Registration” area. Each member must sign-in “once” (1) per day, between the hours of 0800 and 1700 local time. Participants must “sign” by their name indicating their attendance. Attendance will be checked against other 802 groups. Those found abusing the honor system will loose ALL credit for that day. These sheets are provided daily. If you don’t sign up during the “regular sign-in” hours, you will NOT be given credit for that day. Donald Eastlake 3rd, Motorola

8 September 2005 doc.: IEEE /838r8 September 2005 Monday Afternoon, 19 September 2005 Grand Ballroom A, 16:00-18:00 (continued) Review of Task Group Status, Donald Eastlake 3rd 35 intents to submit proposals received 15 proposals submitted, presented and balloted in July 6 remaining proposals to be presented and balloted at this meeting See 11-05/112r14, 11-05/274r10, 11-05/597r10. Motion The proposals listed in 11-05/597r10 are ratified as valid for consideration at the July and September TGs meetings notwithstanding any procedural flaws under 11-05/274r10. Moved: Mathilde Beneviste Second: Juan Carlos Zuniga Passed: (being >75%) Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

9 September 2005 doc.: IEEE /838r8 September 2005 Monday Afternoon, 19 September 2005 Grand Ballroom A, 16:00-18:00 (continued) Presentations and Discussion on Process “TGs Process”, Donald Eastlake 3rd, 11-05/878r0 802.11s and 802.1aq (Shortest Path Bridging) There will be a significant amount of time at the mid-week plenary for 802.1/ interaction. I have agreed to provide some presentation on where we are, perhaps 11-04/1477r4: Terms and Definitions for s 11-04/1174r13: Functional Specification and Scope 802.1 will be interested in having a few people who can vote and comment on our Drafts. 802.1aq is meeting 10:30 to 12:00 Thursday [in Royal F]. Other Technical Presentation “Adjacent channel interference and its impact on the mesh MAC”, 11-05/916r0, Jack Winter Recess until 10:30 Tuesday Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

10 Tuesday, 20 September 2005 Grand Ballroom C&D, 10:30-12:30
doc.: IEEE /838r8 September 2005 Tuesday, 20 September Grand Ballroom C&D, 10:30-12:30 Manual attendance reminder 10:36 Full Proposal Slot A: Mesh DCF (A:8) “A MAC Partial Proposal for IEEE s”, 11-05/869r2, Michael Einhaus 11:52 Partial Proposal Slot B: Mesh Networks Alliance (H:9) “Mesh Networks Alliance: IEEE TGs Proposal submission”, 11-05/600r2, Guido Hiertz 12:30 Recess until 16:00 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

11 Tuesday, 20 September 2005 Grand Ballroom C&D, 16:00-18:00
doc.: IEEE /838r8 September 2005 Tuesday, 20 September Grand Ballroom C&D, 16:00-18:00 Manual attendance reminder 16:06 Full Proposal Slot C: Wi-Mesh Alliance (B:31) “Wi-Mesh Alliance Proposal for TGs”, 11-05/573r4, Juan Carlos Zuniga, Susan Hares 17:22 Other Technical Presentation “Route Discovery Latency in on Demand Routing Protocol”, 11-05/881r0, Yeonkwon Jeong 18:00 Recess until Wednesday 08:00 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

12 Wednesday, 21 September 2005 Grand Ballroom A, 08:00 – 10:00
doc.: IEEE /838r8 September 2005 Wednesday, 21 September 2005 Grand Ballroom A, 08:00 – 10:00 Manual attendance reminder 08:06 Full Proposal Slot D: Proactive Mesh (J:35) “Proactive Mesh Network Framework”, 11-05/386r5, Bing Zhang, Youiti Kado 09:22 Partial Proposal Slot E: Common Control Channel (M:22) “Highlights of the CCC MMAC”, 11-05/904r2, Mathilde Beneviste 10:00 Recess until 13:30 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

13 Wednesday, 21 September 2005 Grand Ballroom A, 13:30 – 15:30
doc.: IEEE /838r8 September 2005 Wednesday, 21 September Grand Ballroom A, 13:30 – 15:30 Temporary Secretary Manual attendance reminder 13:36 Full Proposal Slot F: SEE Mesh (G:7) 14:52 Other Technical Presentation “A Security Model for Wireless Mesh”, Bob Moskowitz 15:30 Recess until 16:00 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

14 Wednesday, 21 September 2005 Grand Ballroom A, 16:00 – 18:00
doc.: IEEE /838r8 September 2005 Wednesday, 21 September Grand Ballroom A, 16:00 – 18:00 Temporary Secretary 16:00 Discussion and Votes on Teleconferences/ad-hoc meetings “TGs Process”, Donald Eastlake 3rd, 11-05/878r1 Votes on teleconferences/ad-hoc meetings Other Technical Presentation “Efficient Routing in Wireless Meshes through Late Binding”, 11-05/909r0, Suman Banerjee Recess until 13:30 Thursday Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

15 Thursday Afternoon, 22 September 2005 Grand Ballroom A, 13:30 – 15:30
doc.: IEEE /838r8 September 2005 Thursday Afternoon, 22 September Grand Ballroom A, 13:30 – 15:30 Manual attendance reminder Proposal 5 minute summaries (11-05/274r10, 11-05/597r11) 14:10 Proposal Ballot Adjourn sine die TGs Motto: Perfection is achieved not when there is nothing left to add but when there is nothing left to take away. Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

16 [Reference Information]
September 2005 [Reference Information] PAR for IEEE ESS Mesh: 11-04/54r2 Five Criteria for IEEE ESS Mesh: 11-04/56r1 Call for Proposals: 11-04/1430r12 Proposal Selection Procedures: 11-05/274r10 Proposal Intents: 11-05/112r14 Proposals: 11-05/597r11 Adopted Task Group Working Documents 11-04/1477r4: Terms and Definitions for s 11-04/1174r13: Functional Specification and Scope 11-04/1175r10: Comparison Categories and Informative Checklists 11-04/662r16: Usage Models 11-04/1543r4: Informative Reference Bibliography for s Miscellaneous Graphs and Mesh, see r0 “Free the APs” Button Graphics: 11-04/518r0 Donald Eastlake 3rd, Motorola

17 [Earlier Minutes] Task Group “s” Meeting Minutes
September 2005 doc.: IEEE /838r8 September 2005 [Earlier Minutes] Task Group “s” Meeting Minutes July 2005 meeting, San Francisco, California, 11-05/715r0 May 2005 Meeting, Cairns, Queensland, 11-05/535r1 March 2005 Meeting, Atlanta, Georgia, 11-05/261r0 January 2005 Meeting, Monterey, California, 11-05/45r0 November 2004 Meeting, San Antonio, Texas, 11-04/1464r0 September 2004 Meeting, Berlin, Germany, 11-04/1125r1 July 2004 Meeting, Portland, Oregon, 11-04/853r0 Recent Teleconference Minutes 14 September 2005, 11-05/888r1 MESH Study Group Meeting Minutes May 2004 Meeting, Garden Grove, California, 11-04/652r1 March 2004 Meeting, Lake Buena Vista, Florida, 11-04/395r2 January 2004 Meeting, Vancouver, British Columbia, 11-04/110r2 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola


Download ppt "September 2005 Mesh Agenda Authors: September 2005 Date:"

Similar presentations


Ads by Google