Presentation is loading. Please wait.

Presentation is loading. Please wait.

Madinat Sultan Qaboos BEC

Similar presentations


Presentation on theme: "Madinat Sultan Qaboos BEC"— Presentation transcript:

1 Madinat Sultan Qaboos BEC
PDO Scaffold Madinat Sultan Qaboos BEC

2 Location PDO Pension houses MSQ
Unsafe Conditions leading to unsafe actions (Awful state) System Scaffold with combination of scaffold boards Boards not secured correctly not close fitted single bay not properly secured No intermediate rails Etc. Solution If BEC are incapable of competent delivery then force them to use the system scaffold with the system boards to match (see RAH standard as the current best practice), if BEC sub contract to IFM get advice from IFM team?


Download ppt "Madinat Sultan Qaboos BEC"

Similar presentations


Ads by Google