Download presentation
Presentation is loading. Please wait.
1
P. Charrue on behalf of AB/CO/IN
CCC - AB/CO viewpoint P. Charrue on behalf of AB/CO/IN
2
Outline Layout CCC and CCR Timetable from now till 1 Feb. 2006
Intercom Video and Fixed Display Fast Analog ConCluCion 19 september 2005 P. Charrue - AB/CO/IN
3
Outline Layout CCC and CCR Timetable from now till 1 Feb. 2006
Intercom Video and Fixed Display Fast Analog ConCluCion 19 september 2005 P. Charrue - AB/CO/IN
4
Typical CCC Working Place
16 LCD 46” Fixed Displays 240 TFT 19” 100 keyboards and mices 20 Phones 100 PCs 40 chairs 19 september 2005 P. Charrue - AB/CO/IN
5
Layout CCR ~90 racks for all electronics and computers Access
Central Timing CATV & Teletext ASOS RF PC from PS HPUX servers HP ProLiants 19 september 2005 P. Charrue - AB/CO/IN
6
AB/CO Timetable 19 september 2005 P. Charrue - AB/CO/IN 5 Dec 2005
Preparation - Racks layout - cabling - 46” screens pre-cabling - Order of PCs and Screens 19 Sept 2005 24 Oct 2005 7 Nov 2005 1 Feb 2006 CCR Ready - Start mounting racks - Electricity and network installation - Installation of electronics and computers CCC delivered to CERN - CCR is operational : Start operational services - Consoles installation - Install PCs and screens CCC functional tests CCC is operational 19 september 2005 P. Charrue - AB/CO/IN
7
Outline Layout CCC and CCR Timetable from now till 1 Feb. 2006
Intercom Video and Fixed Display Fast Analog ConCluCion 19 september 2005 P. Charrue - AB/CO/IN
8
Intercom In the SPS corner, the exact copy of what was available in 2004 will be installed In the PS corner, a COMMEND station interfaced to the ‘old’ PS intercom will be installed COMMEND intercom for access is under IT/CS and TS/CSE responsibility No intercom foreseen for LHC 19 september 2005 P. Charrue - AB/CO/IN
9
Video and Fixed Displays
3 CATV networks available going all around the CCC PS, SPS and SITE TUNER card(s) will be installed in the 2nd line consoles for display MPEG digitized signals available Support for digitization ‘à la source’ One signal takes ~5 Mbit/s of bandwidth Specific software (e.g. VLC) to display anywhere 19 september 2005 P. Charrue - AB/CO/IN
10
Video and Fixed Displays
16 Huge 46” Fixed Displays on the CCC walls 4 home made BlackBoxes each one controlling 4 Fixed Displays CATV input MPEG input Possible capture of any screen of any console to be displayed on the Fixed Display 19 september 2005 P. Charrue - AB/CO/IN
11
46” 46” 46” 46” Fixed Display Layout BlackBox Console CATV MPEG 100/1000 Mbit/s
12
Fast Analog Signal OASIS deployed to acquire the signals near the equipment, digitize them, transport them, and display them in the CCC Consoles Support from CO for : the OASIS Hardware (Crates, cards) the OASIS visualisation software LabVIEW support Possibility to display scope images of analog signals arriving in the CCR, distributed and displayed via CATV (ASOS project) No support for analog cables directly in the consoles. 19 september 2005 P. Charrue - AB/CO/IN
13
Misc AB/CO will provide 16 push buttons in each PS, SPS and LHC corners to allow operators to inhibit/request beams Teletext support The Alcatel IP-touch phones look great and can offer ‘nice’ programmable features. 19 september 2005 P. Charrue - AB/CO/IN
14
Outline Layout CCC and CCR Timetable from now till 1 Feb. 2006
Intercom Video and Fixed Display Fast Analog ConCluCion 19 september 2005 P. Charrue - AB/CO/IN
15
ConCluCion A huge installation work is coming in the next 4 months till 1st February 2006 We are confident that the CCR and the CCC will be installed and available for operation for the 1st February 2006 Still different solutions for PS and SPS (intercom, digital and analog signals, access, …) But now that we will all work in the same place homogenization must be possible 19 september 2005 P. Charrue - AB/CO/IN
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.