Presentation is loading. Please wait.

Presentation is loading. Please wait.

AR report to ADC 14 May 2007 Presented by Hiroyuki Ichijo (JMA)

Similar presentations


Presentation on theme: "AR report to ADC 14 May 2007 Presented by Hiroyuki Ichijo (JMA)"— Presentation transcript:

1 AR-07-04 report to ADC 14 May 2007 Presented by Hiroyuki Ichijo (JMA)
WORLD METEOROLOGICAL ORGANIZATION Weather – Climate - Water WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21st Century AR report to ADC 14 May 2007 Presented by Hiroyuki Ichijo (JMA) World Meteorological Organization

2 Current Situation : Global Telecommunication System (GTS)
WMO GTS WDC & Centres of Excellence Research, Uni & Private  Internet WDC & Centres of Excellence World Meteorological Centres Regional/Specialized Meteorological Centres interconnects Research, Uni & Private National Meteorological Centres Meteorological and R&D Satellite Operator Centres The GTS has evolved to continue to meet its primary role mainly for the World Weather Watch (WWW) programme, but it does not meet all needs of WMO programmes. World Meteorological Organization

3 Towards the WMO Information System (WIS)
World Radiation Centre Regional Instrument Centres International Organizations (IAEA, CTBTO, UNEP, FAO.. ) 5 GAW World Data Centres GCOS Data Centres Global Run-off Data Centre On-demand “pull” IRI and other climate research institutes Universities Regional Climate Centres DCPC NC/ DCPC NC NC/ DPCP GISC Managed, Regional and Internet Communication Networks Satellite Two-Way System Satellite Dissemination Commercial Service Providers Internet WMO World Data Centres What is WIS. A system that extends WMO GTS to meet all programmes information exchange needs and introduces data discovery and access by incorporation of standardised metadata models and access systems in an information management based system. i.e. Move from a communications links based system to a data centric system. Furthermore it is important to open to wider community. Real-time “push” Data exchange : common access procedures ; real-time and non-real time Data management : a few standard formats; coordinated metadata and catalogues World Meteorological Organization

4 Key activity milestones
Consolidate WIS plans: up to 2008 Develop regulatory documents: up to 2008 Develop security procedures: Implement first operational GISC: 2008 Implement other operational GISCs: Implement DCPCs: For MOST requirements, WIS will be operational once GISC, registries & catalogues are in place World Meteorological Organization

5 8 WMO Registered Components
World Meteorological Organization

6 World Meteorological Organization
AR Participation AR-07-01: Enabling Deployment of a GEOSS Architecture AR-07-02: GEOSS Architecture Implementation Pilot IP3 Data for scenarios TIGGE, NCEP Reanalysis CFP Through IP3 World Meteorological Organization

7 World Meteorological Organization
AR Progress Project Manager appointed in March 2007 TOR includes ensuring WIS an effective part of GEOSS Benchmark user requirements & gap analysis Contractor begins mid May 2007 Manuals, technical specs & Documentation Contractor to begin around June 2007 Metadata and standards ETs active Growing involvement within WMO community No GEOSS members registered in task 4. WMO have appointed a project manager for WIS (Me) last March and > the TOR for this position include ensuring WIS is an effective component > of GEOSS. This has included participation in IP3 and supporting of the > CFP as well as taking the lead in AR > > 5. With the GISC due to arrive so soon, WMO has appointed an expert to > review WMO programs' needs on WIS and undertake a gap analysis of what WIS is > planning to deliver against current expectations. The findings of this > report will be a key input into the next ICG-WIS in September. World Meteorological Organization

8 World Meteorological Organization
AR Requirements Need support from GEOSS community Who would like to work with WIS developers & ET? Could do with some help on XML development What is GEO secretariat’s role? Is there a process for making others interested in participating? Want to expose WIS developers to GEOSS community so can understand non WMO members processes. GISC developers need users outside of WMO community to test interoperability interfaces OAI OGC web services etc. 6. One thing the task AR will need is support from other GEOSS > members. This includes finding those who are interested in working with > the VGISC developers to test and help with building the interfaces to > GEOSS including such things if necessary such as OGC web services. As I > am a new task leader, I'd like to know how GEOSEC intends to canvas GEO > Members and Participating Organizations for participation in AR O7 04. > Ideally, there may be more than ADC Members who wish to participate. World Meteorological Organization

9 World Meteorological Organization
Summary Participation in GEOSS is a priority WIS is on track for operations next year Some components can be used in pilots now IP3 demonstrates benefits to WMO of collaboration with non WMO community Would like to know GEO communication strategy. World Meteorological Organization


Download ppt "AR report to ADC 14 May 2007 Presented by Hiroyuki Ichijo (JMA)"

Similar presentations


Ads by Google