Presentation is loading. Please wait.

Presentation is loading. Please wait.

Barbara Kéri • DISC´12 Vukovar December 12, 2012

Similar presentations


Presentation on theme: "Barbara Kéri • DISC´12 Vukovar December 12, 2012"— Presentation transcript:

1 Barbara Kéri • DISC´12 Vukovar December 12, 2012
Status quo in Austria Barbara Kéri • DISC´12 Vukovar December 12, 2012

2 charts Full Inland ENC coverage (330.8 km)
Publication of IENCs according IECDIS Standard 2.1 – March 2011 Topographical data fully updated – March 2012

3 IENC updates

4 Facility information

5 Bridge cross-sections

6 Paper charts huge effort to produce the paper chart lack of automatism
NEWADA duo

7 DoRIS News End of the distribution of mobile transponders ( ) -> Inland AIS equipment obligation ( ) Keep on enhancing the already available services for all users and improve reliability of data The international data exchange will be one big step further

8 EU projects IRIS EU 2  IRIS EU 3 NEWADA  NEWADA duo

9 IRIS Europe 3

10 Overview Motivation: Support Fairway and Traffic Authorities and RIS Providers in enhancing their RIS related services towards the fairway users, and to enable a common quality level of pan-European services Duration: 01/2012 – 12/2014 (3 years) Budget: 10,5 Mio. EUR (aiming for 50% co-funding by TEN-T)

11 Overview Objectives: Providing a cooperative implementation environment Sharing expertise in the day-to-day project work Solving challenges of European interest in a European environment Demonstrating / evaluating new RIS technologies and services Elaborating / implementing quality levels for RIS data exchange Providing transition support from pilot impl. to regular operation Enabling countries tackling national priorities by involving logistics

12 Objectives Improvement of Fairway Information Services
bathymetric IENCs, transient (dynamic) water level models, standardized IENC data exchange, RIS reference data mgmt. Enhanced Traffic and Transport Information Services virtual reference stations, navigational support systems, low cost fuel saving device, mobile RIS applications, incident mgmt. services

13 Objectives Quality of Information Services for RIS
Improvement of operation, service level agreements International RIS data exchange Organisational and legal framework for internat. RIS Data Exchange Enhancement of interfaces for logistics and authorities Enhancement of Interconnections with European Services Interoperability between RIS and Maritime Information Services

14 Expected Impacts Harmonised implementation of RIS in Europe will make another major step forward Enhanced services for governmental and logistics users Geographical extension of RIS Ensuring minimum service levels Thus IRIS Europe 3 will contribute to an increase of safety, efficiency and environmental friendliness of Inland Navigation

15 optimisation of processes
Monitoring Continuous monitoring and surveying of the riverbed (bathymetry) Identification of shallow areas (fords) Water gauges (hydrology) Planning Analysis of surveying results Development of fairway maintenance plan Planning of specific inter- ventions Informing Customer-oriented information on the current status of the fairway Different information tools: NtS, RIS websites, information at locks, ECDIS charts etc. Implementing Dredging of shallow areas by assigned dredging / river engineering companies Monitoring of works / performance

16 KWSM Customer orientated waterway management
Improving of internal processes and procedures KWSM managing board out of via donau (strategic & operational) OSB

17 Processmanagement K01 Infrastruktur-Grundlagen bereitstellen
Management- und Support- prozesse MS01 Unterneh-mensstrategie MS02 Unterneh-menscontrolling MS03 Revision MS04 Recht MS05 Beschaffung MS06 Personal MS07 Rechnungs-wesen MS08 Öffentlich-keitsarbeit / PR MS09 IT MS10 Backoffice MS11 Entwicklung und Innovation ….. Kernprozesse K01 Infrastruktur-Grundlagen bereitstellen K02 Wasserstraße managen K03 Binnenschifffahrtsinformationsdienste bereitstellen K04 Donauschifffahrt entwickeln K05 Hochwasserschutz durchführen K06 Ökologischen Zustand erhalten und verbessern K07 Liegenschaften und Gebäude managen K08 Beratungsleistungen / sonstige Dienstleistungen erbringen MS12.1 Programm / Projektmgnt. MS12.2 Prozess- management MS12.3 KWSM MS12.4 UMS MS12.5 EMS MS12 Managementsysteme

18 aims of processmgmt. initiate organisational thinking
more user orientated increase efficiency identification of gaps and redundancies supporting knowledge transfer

19 Hydrographic Surveying
Increased use of multi beam Measurement of app. 400 river kilometers per year, 30% – 40% measured with multi beam More frequent measurements in critical sections and developement of a profile database data storage back to 2005 profile distance 25 m (standard 50 m) Data analysis of critical sections

20 shallow sections

21 Regelsbrunn

22 Thank you for your attention!
Barbara Kéri Phone:


Download ppt "Barbara Kéri • DISC´12 Vukovar December 12, 2012"

Similar presentations


Ads by Google