Download presentation
Presentation is loading. Please wait.
1
Washington State Department of Health
Architecture for Health Panel Summer meeting 2017
2
DOH Updates 2018 FGI Guidelines CMS Implementation of 2012 NFPA Codes
Electronic Plan Review and Payment
3
The FGI Guidelines 2018 Three separate books: Guidelines
FOR DESIGN AND CONSTRUCTION OF Outpatient Facilities
4
“Beyond Fundamentals”
Inpatient Handbook Outpatient Handbook Residential Handbook Minimum Standards Guidelines FOR DESIGN AND CONSTRUCTION OF Outpatient Facilities
5
The FGI Guidelines 2018 New Outpatient Book
Essentially Part 3 from previous versions “Frankenstein” Approach Stand alone – does not reference Hospital Will have it’s own scope (Chapter 1 & 2)
6
The FGI Guidelines 2018 Updated Acoustic requirements
Expanded sustainability requirements Revised Emergency Preparedness and Management
7
The FGI Guidelines 2018 Telemedicine “Patient of Size”
Procedure, Operating and Imaging rooms New Classifications for imaging based on invasiveness Move towards clearance “kit of parts”
8
The FGI Guidelines 2018 New mobile/transportable unit chapter
New flexibility in Pre/post procedure area Sterile processing Traditional 2 room design Single room with small tabletop sterilizer Ultrasound wand cleaning room New Sexual assault forensic exam room
9
CMS adoption of 2012 NFPA 2012 NFPA 101 and 99 currently enforced
+ CMS changes
10
CMS changes Hospital outpatient surgery is Ambulatory Healthcare Occupancy “Regardless of the number of patients served”
11
CMS changes Roller Latches Still prohibited Rooms with large fire load
Patient rooms Toilet rooms off corridor?
12
CMS changes ABHR Allowed w/ 2012 provisions 1” Clearance
“prohibit inappropriate access”
13
CMS changes Windows required in all patient sleeping rooms
Not fire safety issue Health benefits 36” sill for new Existing rooms? Sleep centers?
14
NFPA 101 22,500 sf vs 40k smoke compartments Suites
Soiled linen or trash (64 gallon = 1 hour) Chapter 43 – Rehabilitation
15
CMS changes
16
NFPA 99 -2012 Did not adopt Chapters 7, 8, 12, 13 Download TIA
Tentative Interim Amendments Scope and Applicability in every chapter New vs. Existing Risk assessments for existing buildings?
18
Rumors Fire rating temporary construction walls
All freestanding EDs will have to be Healthcare occupancies. 2 hour walls have to be built out of wood. Existing hospitals have to comply with all of NFPA 99. Smoke door testing per NFPA 105
19
Other stuff Using Box.com. 99% submissions are electronic now.
Moving away from paper by the end of the year. Electronic payment pilot happening this summer. Hope to have process in place by fall. Functional Program workgroup.
20
Questions? Susan Upton susan.upton@doh.wa.gov 360-236-2948
John Williams
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.