Download presentation
Presentation is loading. Please wait.
1
IMPLEMENTING PRE MOULDED CONCRETE JOB
Making concrete moulder of pre moulding concrete By : SMK NEGERI 5 SURAKARTA
2
Goals of learning Student can understand the way to make pre melted concrete. Student can make mould of pre melted concrete. Teknologi dan Rekayasa
3
Mixture Cement and sand without filtering and oil for making element of column. ½ PC : 1 Kp : 7 Ps or 1 Kp : 5 trass, Sufficient water to make Bataco ½ PC : 1 Kp : 7 Ps, sufficient water for making hole in the mould stone. 1 PC : 1 Kp : 3 Ps, sufficient water for making brick, Teknologi dan Rekayasa
4
Mould device Mechanic mould device Teknologi dan Rekayasa
5
The result of Mould Teknologi dan Rekayasa
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.