PF-0009a
2
TACMS Penetrator Secretary of Defense in conjunction with the Secretary of Energy; submitted a report to Congress dtd July Stating that there are over 10,000 potential "Hard and Deeply Buried Targets" (HDBT) worldwide.
3
ACTD Objectives Demonstrate a Precision Delivery System That Can:
Defeat Hard and Deeply Buried Targets, With Night or Day Capability, In Near-All Weather Develop, Integrate, and Test a New Earth-Penetrating Warhead/ATACMS Block I Missile Demonstrate a Warhead Delivery Capability Range of 230 km (125 nm) Total Payload Weight Not To Exceed 500 lbs Provide for 3 Flight Tests – Beginning Sep FY03 Provide 6 Residual Missiles to the Warfighter – Deliver to U.S. Forces Korea in FY04 PF /25/02
4
OSD, Army , Navy, USFK, DARPA
ACTD Management OIPT OSD, Army , Navy, USFK, DARPA Lead Service Army Interface IPT Missile PFRMS/BAT Reentry Body Navy SSP TPD Roles Army/PFRMS - Transition Manager Army/USFK/PACOM - Operational Manager Navy SSP Technical Manager PF /25/02
5
Developed Configuration
TACMS Penetrator Developed Configuration
6
TACMS Penetrator Operational Concept EPW Exoatmospheric Control System
Apogee Separation EPW Endoatmospheric Control system Steers Missile Computes EPW EPW To Target Impact Point Path To Target Based On Measured Velocity Missile Adjusts Flight Path As Required Launch Missile Burnout Velocity 5000 fps 225 fps Missile Steers To Course EPW Imp acts Target Penetrator Continues Penetrator Fuze Detonates Warhead Buried/Hardened Target
7
TACMS-P Program Schedule
CY2000 CY2001 CY2002 CY2003 CY2004 2005 FY01 FY02 FY03 FY04 FY05 A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Months - 8 - 7 - 6 - 5 - 4 - 3 - 2 - 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 3 9 24 31 34 37 40 TPD Program System IDD SRR PDR CDR Flight - 1 Flight - 2 Flight - 3 Events CA Six Residuals RB IDDs RBA Prel. Dwg Set Avail RB Program LOE Contract Events Prel Design/Proposal RB HW - Flight Test SW Development RBA - 1 Flight Test GTU - 1(A) RB Mech Sim RBA - 2 Build/Tests RB Assembly Elec Build/Test Flight Test GTU - 1(B) RB Electrical Sim Build H/W RBA - 3 S/W Build/Test RBA - 4 to - 9 GTU - 2 EP/RB Flight Avionics Build/Tests Build/Test to LMFC GTU - 1(B) RB Mech. LMFC Build/Tests GTU - 2 EP/RB Flight LMFC Final RB Assembly RBA - 1 to LMFC RBA - 4 to 9 At WSMR & Delivery RBA - 2 to RBA - 3 to LMFC LMFC LMFC System IDD Missile/Launcher Six RBA Residuals Program Events Prel Design/Proposal Missile & Launcher HW - SW Development LMFC Launch Flight - 1 Flight - 2 Flight - 3 Activities Assy/Tests Flight 1 ( - # Months) - 24 - 22 - 19 - 14 - 9 - 7 - 2 - - 40 - 39 - 38 - 37 - 36 - 35 - 34 - 33 - 32 - 31 - 30 - 29 - 28 - 27 - 26 - 25 - 24 - 23 - 22 - 21 - 20 - 19 - 18 - 17 - 16 - 15 - 14 - 13 - 12 - 11 - 10 - 9 - 8 - 7 - 6 - 5 - 4 - 3 - 2 - 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M PF /12/01
8
Summary • OSD/Navy/Army Cooperative Effort
• System Requirements Review Meeting Identified Technical and Program Issues to be Worked. No “Show Stoppers” • Initial Technical Work is Proceeding on Schedule • ACTD Milestone Schedule Requires Continuous Evaluation • Should Meet Our FY04 Delivery of 6 Residuals • Hope to Leverage Lessons Learned to Transition to a Full Scale TACMS-P Program PF /8/02