Winchester Lift Station Odor Control Project
Joe Mouawad, P.E. May 23, 2017
2
Location Map and Background
WINCHESTER LIFT STATION Existing facility was constructed in 1997 Temporary odor mitigation measures currently in place Land use in the immediate vicinity has changed since the station was first constructed
3
Project Considerations
New housing tracts with school and park soon to be built adjacent to Winchester Lift Station Need to implement permanent odor control system Design approach based on Sun City Lift Station Odor Control System Evaluate and mitigate visual impact of the proposed odor control system equipment SIMPSON RD. LA VENTANA RD. PROPOSED DEVELOPMENT TR31100 LA VENTANA RANCH TOWN OF WINCHESTER School and Park Site OLIVE AVE. Winchester Lift Station
4
Winchester Lift Station Odor Control Project Scope of Work
Construct and operate a horizontal biotrickling filter system, with building-like façade screening of odor control equipment to minimize visual impact Coordinate perimeter walls replacement and access gates relocation with developer Replace existing wet well hatches to seal in odor for treatment Test and repair existing wet well liner Similar odor control system successfully implemented at Sun City Lift Station
5
Engineering Consultant Selection
Consultant Selection Criteria Qualifications and experiences Past successful odor control project design Expedited design schedule Proposal commensurate with the level of effort Black & Veatch was selected to complete preliminary design Knowledge of the project Recognized experts in odor control system design and construction Black & Veatch is recommended for the final design engineering work for its expertise, continuation of the project design, and reasonable cost proposal
6
Scope of Work Geotechnical investigation
Design to meet AQMD permitting requirements Complete 100% final design and technical specifications for bidding Building-like façade screening and odor control system illustration for communication with developer Construction estimate Engineering services during bidding
7
Cost Estimate Final Engineering Design Spec Review and Bid/Award
Geotechnical Study Building-like Façade Screening Illustration Engineering Services During Bidding Engineering Branch Labor/Permitting Spec Review and Bid/Award Additional Appropriation $215,000 $15,500 $230,500 Funding previous approved for acoustic and engineering design Engineering Services During Construction Schuler Constructors Inc.’s Bid Proposal Project and Construction Management cost Contingency TOTAL PROJECT COST:
8
Project Schedule Final Design Completion
Construction Bids Due and Recommendations Board Approval/Notice to Proceed Construction Commencement Substantial Completion February 2018 April 2018 June 2018 January 2019 Funding previous approved for acoustic and engineering design Engineering Services During Construction Schuler Constructors Inc.’s Bid Proposal Project and Construction Management cost Contingency TOTAL PROJECT COST:
9
Recommendations Approve and authorize the execution by the General Manager, or his designee, of a professional services agreement with Black & Veatch, San Marcos, California, for final engineering services in support of the Winchester Lift Station Odor Control System Project, in the amount of $184,977; and Appropriation of $230,500 to fund project costs through construction bid/award phase.
10
Contact Information Joe Mouawad, P.E. Assistant General Manager Planning, Engineering, and Construction (951) Ext. 4463