Download presentation
Presentation is loading. Please wait.
Published byArnold Hubert Armstrong Modified over 6 years ago
1
ARMA PM2.5 Testing & Emissions Rate Sampling
August 27, Neil Gresham CertainTeed Corporation
2
ARMA Emissions Factor/Rate Project
Purpose: Update the 2003 ARMA roofing manufacturing emissions factor document to increase utility and add PM2.5 data to assist members with permitting. Project Steps: Collect member company testing data, And evaluate for acceptability for updating the 2003 ARMA emissions factors document, Develop permanent database with consultants that would be maintained by ARMA staff.
3
ARMA Emissions Factor-Rate Project
Recent Activity: This summer, the PM2.5 Task Force compiled draft spreadsheet outlining the database needed for the data gathering. Members reviewed and provided comments. Submitted draft database to consultants on August 7, Consultant has provided comments and draft has been circulated again to members. Based on review and suggestions, consultants are building permanent database. No advancement to date on alternate test methods for wet stacks for PM some work still pending
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.