MICE VLPC Cryo Update Alan Bross MICE CM18 June 13, 2007
2
Production Cryostats Production cryostats Number 1 is complete
Cryo Operation Good Enough headroom to in UK with good margin Calibrated Outfitted with AFEIIt boards Cassettes fully characterized Ready for crating
3
Production Cryostats II
Currently under test Cryo-operation good (even better than #1), plenty of headroom for 50 Hz operation Calibrated Will thermal cycle at least one more time AFEIIt boards assigned and in place (needed for temp cal) Cassette characterization still needs to be done
4
Production Cryostats III & IV
Production cryostats 3 and 4 are in assembly We have all parts in hand Most of the work is done Need 4 more cassettes from D0 to complete We have 5 from D0 now 1 in 2 in P.C#1 2 in P.C#2 We will have to begin this negotiation Once we have the cassettes, about 2-3 weeks to complete assembly Production Cryo #3 Top plate showing cryo-cooler