WLTP-17-11e Status report / Activity Plan of Evap Task Force 10th Jan., 2017 M. Morimoto (JASIC)

2 Get GRPE approval of EVAP GTR w/o sealed tank sys. test procedure.
Status & Schedule Submit Evap GTR without sealed tank system test procedure & Technical Report to GRPE in January 2017. Sealed tank system test procedure will be discussed in following schedule. 2016 2017 Oct Nov Dec Jan Feb Mar Apr May Jun GRPE IWG TF 12-13 #74 GRPE XX #75 GRPE Get GRPE approval of EVAP GTR w/o sealed tank sys. test procedure. 5-7 WLTP #16 10 WLTP #17 XX WLTP #18 XX WLTP #19 TODAY IWG approved EVAP GTR w/o sealed tank sys. test procedure Get IWG approval of EVAP sealed tank sys. test procedure. 31 Web wk20? Web wk20? Web TBD Face 2 Face?

3 Feature of Sealed Tank System
② Open before refueling Puff loss Canister Relief Pressure Valve ① Kept closed during parking Loading process for sealed tank need to represent the vapor flow through ② , NOT ① ① No fuel vapor flow into the canister during parking because the control valve kept closed. ② Fuel vapor into the puff loss canister only before refueling. (The relief pressure valve opens when the refueling event starts, then closes after tank pressure goes down.)

4 Discussion points of Sealed Tank System Test Procedure
Non Sealed Tank System Test procedure Sealed Tank System Test Procedure Fuel drain and refill Pre-conditioning 23 +/- 3 °C Soak A “A series of procedure” OR “Separate procedure for puff loss loading volume” 2g breakthrough to be replaced by puff loss loading. 15% refill Drain and refill by opening fuel lid and/or cap Tank pressure relief 2g breakthrough Canister loading 85% fuel consumed equivalent Canister purge temperature, duration,,, Soak inside SHED loading by opening the fuel lid overflow vapor 40% refill to be consisted with non-sealed system Fuel drain and refill OVC-HEV only Battery fully charge 2g breakthrough Canister loading WLTC purge cycle Test drive Min 23 °C / Max 31 °C for 60 min Hot Soak 23 +/- 3 °C Soak Start 20 °C to Max 35 °C 24 hrs for 2days 1st and 2nd day Diurnal B C D Relief Pressure Requirement for Sealed Tank System

5 Main Proposals & Comments from TF members
Discussion points EC Proposals JAPAN Positions (Ref) Comments from other Parties A: Test sequence a series of procedure separate procedure (one for measuring puff loss loading volume, another one is identical to non sealed tank ) B: Condition before puff loss loading 6 to 36 hrs soak at 35°C same profile as DBL (expert) ensure that all vapor vent through the canister C: Overflow vapor need to regulate (measure by connecting 2nd canister) (expert) overflow vapor should be measured in the SHED D: Relief Pressure Requirement tank temp. : 40 °C fuel : RVP=70KPa no canister weight Room temp. : 35°C Fuel : RVP=75kPa Test cycle : LMHM with CS (expert) fuel temp. : 20-40°C fuel volume : 40% fuel : RVP=70 kPa (OICA) using winter fuel at temperatures in summer makes no sense Refer to appendix for more details

6 END