Download presentation
Presentation is loading. Please wait.
Published byMervyn Wilcox Modified over 6 years ago
1
EXTENSION ELENA = BUILDING 193 Status of integration
O.Choisnet / ELENA collaboration
2
INTEGRATION OF BUILDING 393
HALL 193 O. Choisnet / ELENA collaboration
3
INTEGRATION OF BUILDING 393
O. Choisnet / ELENA collaboration
4
INTEGRATION OF BUILDING 393
KICKERS CV ACCESS to B.193 ENTRANCE MAIN O. Choisnet / ELENA collaboration
5
INTEGRATION OF BUILDING 393
KICKERS (12.7x14.7 m2) (5x3 m2) Storage GBAR FLOOR ASACUSA (6x3 m2) Storage (6x3 m2) Storage ALPHA WC (6x3 m2) Storage AEGIS Workshop (5x6 m2) Cleaning Room (5x4 m2) Area (8x4.6 m2) Offloading ATRAP Storage (6x3 m2) Test Bench (7x10 m2) BASE Storage (6x3 m2) O. Choisnet / ELENA collaboration
6
INTEGRATION OF BUILDING 393
Mezzanine Storage Storage Storage Storage Storage O. Choisnet / ELENA collaboration
7
INTEGRATION OF BUILDING 393
Emergency Emergency Door O. Choisnet / ELENA collaboration
8
INTEGRATION OF BUILDING 393
Material Door Staff door Electrical boxes O. Choisnet / ELENA collaboration
9
INTEGRATION OF BUILDING 393
Height under cables ladder Material Door Height under mezzanine Staff door Electrical boxes O. Choisnet / ELENA collaboration
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.