PLCS - Delivering the Promise
OASIS DEX Co-ordination Sub-Committee 4 – 5 February 2004
2
An MoD Asset
3
Through Life Information
Sub Contractor Supplier RN ARMY RAF MOD Prime Through Life Product Data
4
The Standard for the Exchange of Product Data
IS 10303 The Standard for the Exchange of Product Data
5
The ILS Process
6
DEX 1 / 8 Configuration Statement
Development Team led by Rolls Royce Scope is to enable the transfer of a statement of the product physical breakdown structure as designed, as built or as planned WSA has conducted an assessment of DEX 1 against an existing automated exchange between the Submarine Design Definition System (SDD) and Devonport Dockyard’s Vessel Materiel Planning System (VMP)
7
DEX 1 / 8 Configuration Statement
Assessment Result : 100% of the requirement was contained within the AP 239 Data Model 95% of the requirement was contained within the scope of DEX 1 as then drafted Way ahead : Investigate applicability of DEX 8 to exchange Product_as_Individual information Build a DEX 8 import/export interface into SDD
8
DEX 4 Work Request Development Team led by LSC Group
Scope is to enable the transfer of a Work Package containing the details of the required tasks for a given Support Period The Work Package file, as generated by the new WSA Maintenance Management System (UMMS) for export to the Dockyards has provided a target data set to define the exchange scope.
9
DEX 4 Work Request Work has included :
Mapping the UMMS data set to the AP239 data model Developing an XML based architecture for the exchange Building an XSLT automated data transformation capability Capability built into UMMS for its roll-out in September 2003
10
UMMS Architecture
11
WSA STEP Adoption Proposed Road Map
12
Implementation Architecture
13
UMMS PEPS Datahub SS-CWE SSDD CRISP Generate task requirement
Request affected Equip ID’s from SSDD Request availability of replacement equipment Request details of A&A Pass to dockyard for cost estimate Approve task for completion Feedback UMMS PEPS Platform Name OpDef category OpDef description Asset ID Datahub SS-CWE SSDD CRISP
14
UMMS PEPS Datahub SS-CWE SSDD CRISP Generate task requirement
Request affected Equip ID’s from SSDD Request availability of replacement equipment Request details of A&A Pass to dockyard for cost estimate Approve task for completion Feedback UMMS PEPS Platform Name Compartment ID Datahub SS-CWE SSDD Equipment ID’s A&A No. [for each equipment]affected by CRISP
15
UMMS PEPS Datahub SS-CWE SSDD CRISP Generate task requirement
Request affected Equip ID’s from SSDD Request availability of replacement equipment Request details of A&A Pass to dockyard for cost estimate Approve task for completion Feedback UMMS PEPS Datahub SS-CWE SSDD Equipment ID’s Quantity Date for delivery Stock availability CRISP
16
UMMS PEPS Datahub SS-CWE SSDD CRISP Generate task requirement
Request affected Equip ID’s from SSDD Request availability of replacement equipment Request details of A&A Pass to dockyard for cost estimate Approve task for completion Feedback UMMS PEPS A&A Details:- Drawings, Description Datahub SS-CWE SSDD A&A No’s affecting compartment CRISP
17
UMMS PEPS Datahub SS-CWE SSDD CRISP Generate task requirement
Request affected Equip ID’s from SSDD Request availability of replacement equipment Request details of A&A Pass to dockyard for cost estimate Approve task for completion Feedback UMMS PEPS Task Specification Estimate cost Cost Datahub SS-CWE SSDD CRISP
18
UMMS PEPS Datahub SS-CWE SSDD CRISP DATA WRITE: Task Specification
Generate task requirement Request affected Equip ID’s from SSDD Request availability of replacement equipment Request details of A&A Pass to dockyard for cost estimate Approve task for completion Feedback UMMS PEPS DATA WRITE: Task Specification DATA WRITE: Job complete Do work Task Specification Datahub SS-CWE SSDD CRISP
19
Feedback Loop UMMS PEPS Datahub SS-CWE SSDD CRISP
Generate task requirement Request affected Equip ID’s from SSDD Request availability of replacement equipment Request details of A&A Pass to dockyard for cost estimate Approve task for completion Feedback UMMS PEPS Job ID Actual parts used Changes to task spec Datahub SS-CWE A&A No implemented SSDD A&A No implemented CRISP Associated changes to scale
20
Information Systems Integration Hub
21
Information Systems Integration Hub