Presentation is loading. Please wait.

Presentation is loading. Please wait.

Status Report of GISC Beijing

Similar presentations


Presentation on theme: "Status Report of GISC Beijing"— Presentation transcript:

1 Status Report of GISC Beijing
GISC Beijing/CMA

2 WIS implementation of GISC Beijing
Endorsed by ET-GDDP Started official operation 2009 2010 2011 2012 2013 Started the Development of WIS service: Collaborated with JMA and DWD on the development of metadata synchronization and data provision Approved by Cg-XVI Area of responsibility of GISC Beijing: WWIS ( HongKong, China ) Mogolia Nepal Pakistan HongKong , China Macao, China International roles of CMA: GISC Beijing RTH Beijing (DCPC) RCC Beijing (DCPC) RSMC Beijing – Geographical (DCPC) RSMC Beijing – Activity – ATM (DCPC) National Satellite Meteorological Center (DCPC)

3 Data Communication Network
Thailand Vietnam North Korea Mongolia South Korea Offenbach Tokyo Moscow New Delhi RMDCN MPLS VPN Australia Pakistan 64 Kbps 256 450Mbps 4Mbps 10Mbps 50Mbps 16Mbps Eumetsat USA Beijing 20Mbps Internet Toulouse Nepal

4 Data service of GISC Beijing
GB in total per day. GB/Day GISC Beijing subscription services via CMACast broadcast System Subscription services via Internet MB/Day Until 10th Oct 2015, register users from 35 country/area are up to 105. About 34,800 browsing amount in 2014.

5 Amount of data for downloading
Data available from DCPCs DCPC Data Type Amount of data for downloading RCC Beijing Climate monitor products 25M RSMC Beijing – Geographical RSMC Beijing – Activity – ATM Warning 18G per day T639L60 GMF products TIGGE products (NMC) National Satellite Meteorological Center FY-2E products 840G per day FY-3B products FY-3C products

6 Capacity building GISC Beijing provided on-site training to AoR of GISC Beijing and neighbouring NMHMs, including the guidance for WIS implementation and/or application of subscription data on weather forecast. 12th-20th FEB 2014, to Tajikistan 21th-26th APR 2014, to Pakistan 212h-26th Dec 2014, to Nepal 22th-26th Jan 2015, to North Korea 27th-31th Jan 2015, to Myanmar

7 GISC Backup GISC Beijing and Tokyo exchanged their routing catalogs and analyzed all data in the lists. Observational data in BUFR, Surface data and Upper air data will be disseminated to DCPC Bangkok and DCPC Hong Kong from their backup GISC during this year.

8 CMA’s Disaster Recovery Site
CMA’s Disaster Recovery Site in Yungang that is 21KM away from CMA. As one of the importance parts of DRS, there is a backup system with the same architecture as RTH Beijing. When MSS of RTH Beijing, web service of GISC Beijing or network connection to RMDCN has failure, these services will be continuous provided by DRS in Yungang. CMA is scheduling some connection tests with other GISCs.

9 Ongoing work Updating Beijing WIS Portal system to the 2nd version ( v2.0) developing WIS monitoring service in GISC Beijing ( according to the “GISC MONITORING AND REPORTING REQUIREMENTS” from WIS Monitoring Workshop ) to enhance monitoring and warning for availability of system and WIS services ( facing to system administrators ) to provide meaning real-time WIS monitoring service ( facing to WIS users ) to provide quarterly reporting to WMO to provide incident reporting to WMO optimizing existing functions in v1.0 Metadata Search ( SOLR service/ Geographic service ) 24h Cache access ( to support GISC backup service ) Subscription ( to improve interactive interface, all internal DCPC subscription is available in GISC Beijing) Web ingest ( to apply https ) adding new functions User forum IQWMA

10 Plans The 2nd version of Beijing WIS Portal will be in operation before July 2016. To make progress in implementing AMDCN and Continue to prompt the capacity building for AoR of GISC Beijing in 2016.

11 Summary Ms Zhu reported the current statues of routine dissemination for GISC Beijing’s subscription users. Dissemination via CMACast takes the major work for subscription service. GISC Beijing provided on-site training to AoR of GISC Beijing and neighbouring NMHMs in 2014 and 2015. Ms Zhu introduced a disaster recovery site of GISC Beijing was built in 2014, it is 21KM away from CMA. As one of the importance parts of DRS, there is a backup system with the same architecture as RTH Beijing. When MSS of RTH Beijing, web service of GISC Beijing or network connection to RMDCN has failure, these services will be continuous provided by DRS in Yungang. CMA is scheduling some connection tests with other GISCs. Ms Zhu introduced CMA has started the work to update Beijing WIS Portal system to the 2nd version ( v2.0), including developing WIS monitoring service in GISC Beijing and optimizing existing functions. The new system will be in operation before July 2016. GISC Beijing plans to make progress in implementing AMDCN and Continue to prompt the capacity building for AoR of GISC Beijing in 2016. .

12 Thanks for your attention.


Download ppt "Status Report of GISC Beijing"

Similar presentations


Ads by Google