Presentation is loading. Please wait.

Presentation is loading. Please wait.

SwissIX Update #12 SWINOG#24 – 10.May.2012 Basile Bluntschli

Similar presentations


Presentation on theme: "SwissIX Update #12 SWINOG#24 – 10.May.2012 Basile Bluntschli"— Presentation transcript:

1 SwissIX Update #12 SWINOG#24 – 10.May.2012 Basile Bluntschli

2 Members Ports Capacity 132 Active Members connected
2 new Members during the last months Ports some pending 10 Gig Upgrades Total: 146 active Ports Capacity 300 Gbps+

3 Traffic 1 year ago:

4 Traffic now:

5 Traffic growth:

6 What’s Next?

7 Core Network Now: e-Shelter Interxion 10 Gig 10 Gig 20 Gig 10 Gig
with DWDM 10 Gig ColoZüri Equinix

8 Core Network with DWDM:
up to 80 Gig e-Shelter Interxion up to 80 Gig up to 80 Gig up to 80 Gig ColoZüri Equinix up to 80 Gig

9 Core Network with DWDM:
e-Shelter Interxion up to 80 Gig up to 80 Gig up to 160 Gig up to 80 Gig ColoZüri Equinix

10 SwissIX Sites: ColoBâle AG colobern.ch colozueri.ch
e-shelter facility services (Schweiz) AG Equinix (Switzerland) Zurich Datacenter ICT Center Zurich InterXion Switzerland IWB Telekom Layer One AG

11 Thanks to the SwissIX Sponsors: ColoBale | colobern. ch | colozueri
Thanks to the SwissIX Sponsors: ColoBale | colobern.ch | colozueri.ch AG | e-shelter Equinix (Switzerland) AG | ewz Telecom | Gas&Com AG | ict-center interxion (Switzerland) AG | iway AG | IWB Telekom | Layer One AG Litecom | nexellent ag | nine.ch | nts.workspace ag Contact: basile dot bluntschli at swissix dot ch


Download ppt "SwissIX Update #12 SWINOG#24 – 10.May.2012 Basile Bluntschli"

Similar presentations


Ads by Google