1
DLA Annual Tire Industry Symposium USAF Tire Forecast 2d Lt Trung Q
DLA Annual Tire Industry Symposium USAF Tire Forecast 2d Lt Trung Q. Nguyen 417 SCMS/GUEA DSN 24 July 2012
2
Overview Tire Team POC’s In Progress On Deck Overview
Discussion/Questions
3
Tire Team POC’s USAF POCs DLA Aircraft Tire Team
USAF Lead Tire Engineer, David Frederick DSN USAF Tire Engineer, 2dLt Trung Q. Nguyen DSN USAF Tire Equipment Specialist, Dave Palmer DSN DLA Aircraft Tire Team Acquisition Specialist, Jonathan Sanders DLA-Tire Team (Supply), Philip Ludwig Product Specialist, Matthew Harmon
4
F-16 Tires Aircraft Tire Size Position Mfg QTR NSN F-16 Nose Tires
18x5.7-8/18 Nose Goodyear 461B-3563-TL Use until exhausted Michelin TL Improved tire – Jan 2013 TL F-16 Blk 30 25.5x8.0-14/20 Main TL Sup 1 LW 25.5x8.0-14/20 Desert 461B-3529-TL 25.5x8.0R14 (Radial) 461B-3917-TL TL sup 1 F-16 Blk 40/50 27.75x /24 TL HW 27.75x /24 Extra Duty 461B-3537-TL 27.75x8.75R14.5/24 (Radial) 461B-3790-TL Should be available – Sep 2012 461B-3792-TL TL Rev A 27.75x8.75R14.5/24 Desert (Radial) 461B-3568-TL
5
F-16 Tires IP F-16 Nose (3821) F-16 HW Main (4582)
Hill AFB and Tucson ANG Positive trend in landings LCC completion: Oct-Nov 2012 F-16 HW Main (4582) Most recently completed LCC Worldwide tire Going online
6
T-38 Tires IP T-38 Main Radial NSN 2620-01-321-1049 20x4.4R12/14PR RC
Goodyear and Michelin designs Columbus and Laughlin AFB LCC completion: Feb-Mar 2013
7
KC-135 Tires IP KC-135 Main Radial C-5 Main/Nose NSN 2620-01-517-7526
49x17R20/26PR Michelin PIP completed; Goodyear PIP on going Goodyear PIP completion: May 2013 LCC start date: Sep 2013
8
B-1 Tires IP B-1 Main NSN 2620-01-207-5302 46x16-23.5 Finalizing specs
Late August completion/release Michelin PIP completed QTR submission: Jan-Apr 2013
9
A-10 OD A-10 Main NSN 2630-01-129-7607 36x11 Radialization
W&B redesign in progress Specs in works Release Oct-Nov 2012
10
F-15A/E OD F-15A/E Main Customers’ demand Improving radial/bais
Reevaluation of performance Dec 2013
11
LCC Forecast Overview Aircraft R/B PIP LCC Type Status F-16 B Done
In progress Nose Finishing up LCC at Tucson and Hill AFB T-38 MLG LCC recently started; slated for early 2013 finish KC-135/C-5 R In Progress Sep 2013 Goodyear PIP in progress; Michelin's PIP completed B-1 Jul 2013 Specs are being finalized A-10 May 2013 W&B redesign on going; specs are in works F-15E FY 2014 Improving wear and landing performance F-15A/D F-16 LW/HW FY 2017
12
Global Logistics – Warfighter Focus