Presentation is loading. Please wait.

Presentation is loading. Please wait.

Steve Woolard Project Engineer

Similar presentations


Presentation on theme: "Steve Woolard Project Engineer"— Presentation transcript:

1 Steve Woolard Project Engineer
CHRISTCHURCH BEACH RECYCLING SCHEME - SPRING 2015 Steve Woolard Project Engineer Christchurch Borough Council

2 EASTERN END OF AVON BEACH & PROMENADE Concrete terracing exposed
Concrete terracing covered by beach Jan 2014 Oct 2008 June 2007 Concrete terracing exposed

3 Previous Beach Recycling Operations
MUDEFORD SANDBANK FRIARS CLIFF BEACH Operations undertaken during a low spring tidal cycle

4 Case Study: Christchurch Beach Recycling Scheme – Spring 2015
Project: Approved scheme to return beach volumes between Mudeford Quay and Steamer Pt to pre-2013/14 storm damage levels. Option 1: Recycle up to 20,000cum of material from the ebb-tide delta off the northern tip of Mudeford Sandbank. Option 2: Import beach material from licenced dredging site off the IoW. Funding: Via the FCERM Grant in Aid Recovery programme. Budget £900,000. Tenders due for return by mid February Construction programmed for mid-April with completion due by the end of May 2015.

5

6

7 AMPHIBIOUS EXCAVATOR

8 Aerial photograph captured April 2015
AVON BEACH COMPOUND

9 MECHANICAL ENHANCEMENT OF NAVIGATION CHANNEL

10 COMMENCEMENT OF DREDGING…..

11

12 Are they having a laugh!!

13

14

15 LOOKING SOUTH WEST TOWARDS CHRISTURCH HARBOUR ENTRANCE

16

17

18

19

20

21 Transportation of dredged material

22 THANK YOU Any Questions?