CHRISTCHURCH BEACH RECYCLING SCHEME - SPRING 2015 Steve Woolard Project Engineer Christchurch Borough Council
2
EASTERN END OF AVON BEACH & PROMENADE Concrete terracing exposed
Concrete terracing covered by beach Jan 2014 Oct 2008 June 2007 Concrete terracing exposed
3
Previous Beach Recycling Operations
MUDEFORD SANDBANK FRIARS CLIFF BEACH Operations undertaken during a low spring tidal cycle
4
Case Study: Christchurch Beach Recycling Scheme – Spring 2015
Project: Approved scheme to return beach volumes between Mudeford Quay and Steamer Pt to pre-2013/14 storm damage levels. Option 1: Recycle up to 20,000cum of material from the ebb-tide delta off the northern tip of Mudeford Sandbank. Option 2: Import beach material from licenced dredging site off the IoW. Funding: Via the FCERM Grant in Aid Recovery programme. Budget £900,000. Tenders due for return by mid February Construction programmed for mid-April with completion due by the end of May 2015.
7
AMPHIBIOUS EXCAVATOR
8
Aerial photograph captured April 2015
AVON BEACH COMPOUND
9
MECHANICAL ENHANCEMENT OF NAVIGATION CHANNEL
10
COMMENCEMENT OF DREDGING…..
12
Are they having a laugh!!
15
LOOKING SOUTH WEST TOWARDS CHRISTURCH HARBOUR ENTRANCE
21
Transportation of dredged material
22
THANK YOU Any Questions?