How to avoid melt-down of your Solar Heating System
Solar (over) Heating How to avoid melt-down of your Solar Heating System SH - A Miller August 2011
2
Overview Bad Experience Why did it do this Re-design Advice
SH - A Miller August 2011
3
Bad Experience Pressure excursion Melted Expansion Vessel
SH - A Miller August 2011
4
Bad Experience Pressure excursion Melted Expansion Vessel Leaks
SH - A Miller August 2011
5
Bad Experience Pressure excursion Melted Expansion Vessel Leaks
Melted pump station SH - A Miller August 2011
6
Why did it do this Simple Layout Normal Operation PUMP STATION
EXPANSION VESSEL TANK HEATING UP SH - A Miller August 2011
7
Why did it do this Tubes Designed for stagnation but not the other components Layout Vapour Convection STAGNATION – VAPOUR BUBBLE - 270° PUMP STATION EXPANSION VESSEL NO FLOW Fully hot TANK SH - A Miller August 2011
8
Layout STAGNATION – VAPOUR BUBBLE - 270° PUMP STATION EXPANSION VESSEL
NO FLOW Fully hot TANK SH - A Miller August 2011
9
Re-design Anti-siphon loop Secondary circuit SH - A Miller August 2011
10
Layout – Re-design AUX. TANK (UNLAGGED) PUMP STATION EXPANSION VESSEL
SH - A Miller August 2011
11
Layout – Re-design AUX. TANK (UNLAGGED) PUMP STATION EXPANSION VESSEL
NO FLOW Fully hot TANK SH - A Miller August 2011
12
Conclusions Do not assume installers know it all
Ask some awkward questions Plumbing skill greater than average plumber’s Layout needs careful design SH - A Miller August 2011