1 2017 Reconstruction of Northfield Street
PUBLIC MEETING 2/15/2017 Project Introduction Description & Budget Public Communications Project Schedule Project Overview Maps Temp. Water Main Project Detours Roadway Detail Street Sections Notify Me- Sign Up Q&A Presented by: The Department of Public Works Designed by: Durfresne Group Video Recording: ORCA MEDIA

2 Project Description and Budget
Project Summary of Work: 4,300 LF of New Water Main 4,400 LF of New Sewer Main 4,300 LF of Reconstructed Roadway 11,500 SY of Concrete Roadway Removal 3,600 LF of New 5' wide Bike Lane 1,440 SY of New Concrete Sidewalk 200 SY of New Asphalt Sidewalk 3500 LF of New Underdrain *Work to include general roadwork, guardrail replacement, retaining walls, and other incidental items necessary for the completion of the project not listed above. SEEKING VOTING APPROVAL: MARCH 7, 2017 BOND VOTE

3 PUBLIC OUTREACH AND COMMUNICATIONS PLAN
Consultant Services: Francine Perkins- FRP Enterprises Public Outreach Coordinator Weekly project updates to be posted on FRP website and City website Notify Me Alerts Door to Door notifications- sidewalk closures, driveway obstructions, and emergency situations. City of Montpelier Staff Kurt Motyka- City Engineer Zach Blodgett - Staff Engineer Ginny Mackey- Administrative Assistant Jamie Granfield: Administrative Assistant

4 PROJECT SCHEDULE

5

6

7

8 TEMPORARY WATER MAIN PLAN

9 Project Detour Map

10 ROADWAY TYPICAL DETAIL
5” NEW PAVEMENT 11” EXISTING CONCRETE TO BE REMOVED

11 ROADWAY SECTIONS 1+00

12 ROADWAY SECTIONS 4+00

13 ROADWAY SECTIONS 10+00

14 ROADWAY SECTIONS 15+00

15 ROADWAY SECTIONS 15+00

16 ROADWAY SECTIONS 20+00

17 ROADWAY SECTIONS 27+00

18 ROADWAY SECTIONS 30+00

19 ROADWAY SECTIONS 35+00

20 ROADWAY SECTIONS 38+00

21 ROADWAY SECTIONS 42+50

22 NOTIFY ME- SIGNUP Look for instructional sign-up flyer in mail for specific set-up instructions. Provide address and select Sign In. To receive HTML s check box To receive text message check box and enter your cell phone number. Click save 4) Subscribe to Alert Center Click icon(s) /Text/Both

23 Links: Design Plans Traffic Control Plans