Download presentation
Presentation is loading. Please wait.
1
SHARE 2012 Planning Meeting 9/6/12
Expected Collection Date: 1 day between September 17-25th Sensor Update: No NRL SAR, chance of terrasar-x PI Target Update: Communications: chk & GO/NO GO Check message at Twitter 9AH_DIRS Timeline: Spectral Measurements Flag System: Team assignments: Food / Hardware Runner _______________ Radiosonde Assistant: AnneMarie and __________ ASD #1 Kelly and ________ ASD #2 RCR AnneMarie and _________ SpectraVista: John K and students Jamie/Emmett Shadow Target Deployment and __________ Erin Ontiveros & 10 T-shirt models _______ Ground Based LIDAR: Kerry and ________ Shea LIDAR targets _________ Test Target Deployment week of Sept when John K returns Thurs/Friday Next week early pack Trailer Contact: Nina Raqueno cell Can you help? Respond to Doodle Poll
2
SHARE 2012 Planning Meeting
Expected Collection Date: 1 day between September 17-25th Timeline: Night Before Weather Decision and Stand-by 6:00AM Final Weather Decision and CHK for or Call in 7:00AM Meet at RIT carpool 7:45 Arrive at AVON Site 8:00-10:00 Deploy Targets 10:00 Radiosonde #1 Launch 10-11:15 Start Spectral Measurements 10:15 SIGNAL 2 HORN BLASTS - WASP to begin 10:30 AVON WASP Overflights Begin EW then NS 11:15 SIGNAL 5 HORN BLASTS Everyone under Pavilion or Tshirts in Place 11:30 AVON SpecTIR Overflights begin 12:00PM All Aircraft Clear Avon Start Conesus, Hemlock, Quarry Resume ASD Measurements & Move Targets to PM 12:00 SIGNAL 2 Sets of 3 HORN BLASTS Aircraft Clear move targets 12:30 Radiosonde #2 (plan A) 1:00-2:00 Aircraft Return to Avon Site 2:30 Radiosonde #2 (plan B) 3:00 5th Aircraft Polarmetric
3
SpecTIR Timeline 11:00 Launch Downtown Roc 15 min imaging
ferry & coordinate w other aircraft 15 min 11:30 Avon min imaging wide range of targets from bright white tyvek to black fabric panels fly FL1 & FL2 once fly short FL3 twice 12:15 Conesus Water 15 min imaging adjust gain for water target 12:45 Hemlock Forest 15 min imaging optimize for vegetation 1:15 Quarry min imaging optimize for bright minerals 1:45 Avon min imaging 2:15 Done 2:30 Airport
4
WASP/LIDAR Timeline 10:15 Launch ferry to site
10: :00 Avon hour imaging Center NS FL ALL EW FLS ALL NS FLS ferry & coordinate w other aircraft 15 min 12:15 Conesus Water 15 min imaging adjust gain for water target 12:45 Hemlock Forest 15 min imaging optimize for vegetation 1:15 Quarry min imaging optimize for bright minerals 1:45 Avon min imaging fly condensed PM FLs wide range of targets from bright white tyvek to black fabric panels 2:30 Done 2:45 Airport
6
Target ASD / GPS Naming System
SHARE 2012 Target ASD / GPS Naming System Expected Collection Date: 1 day between September 17-25th Contact: Nina Raqueno cell Request ASD Measurements here:
7
A place for PI to describe measurement SUBJECT DESCRIPTION
Measurement Details Ref/Rad PI Name Initial Spectra/GPS Filename: PAGRY1_F GPS/ Camera Spectra
8
Mode: ReFlectance (F)or RAdiance (A) 3 Letter Code for Material
Volleyball Sand Reflectance Measurement Anytime OK Does not move Kelly Canham C CASND1_F Mode: ReFlectance (F)or RAdiance (A) GPS/ Camera PI last name initial 3 Letter Code for Material Measurement Number 1-9 __ Space Reserved for Measurement Retakes/Mistakes/Clouds starting with b,c,d,e,f.... Spectra AM or PM location
9
Mode: ReFlectance (F)or RAdiance (A) 3 Letter Code for Material
New Target of Opportunity found in the field during afternoon flight Take 4 measurements in Radiance mode Kelly Canham C CPZZZ1_A Mode: ReFlectance (F)or RAdiance (A) GPS/ Camera PI last name initial 3 Letter Code for Material Measurement Number 1-9 __ Space Reserved for Measurement Retakes/Mistakes/Clouds starting with b,c,d,e,f.... Spectra AM or PM location
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.