Presentation is loading. Please wait.

Presentation is loading. Please wait.

Hammer Project KV020 S-KPI CBO

Similar presentations


Presentation on theme: "Hammer Project KV020 S-KPI CBO"— Presentation transcript:

1 Hammer Project KV020 S-KPI CBO
Project CA project S00102 oss KPI justification - Appendix © Ericsson AB 2016

2 Multitech 3G kpi Justification
PROJECT BAU MODERNIZATION Multitech 3G kpi Justification

3 S00102 3G oss kpi justification
# Description Target Value Technology Baseline KPI Result PASS/FAIL Comments 3G :00 to :00 :00 to :00 Please find the OSS Analysis sheet. A Cell Availability Maintain/Improved 99.82 99.50 Fail Refer to OSS Analysis A CSSR_AMR 99.83 99.85 PASS A CSSR_PS 99.69 99.68 Nornal fluctuation A AMR Call Drop Ratio 0.28 0.15 A PS Service Drop Ratio 0.44 0.46 A SHO Success Rate (AMR Service) 99.95 99.97 A SHO Success Rate (PS Service) 99.93 99.90 A HS-DSCH Service Cell Change Success Rate 99.99 99.98 A HSDPA RAB Setup Success Rate 98.88 98.91 A HSUPA RAB Setup Success Rate 99.84 A HSDPA Retainability 0.68 A HSUPA Retainability 0.66 0.67 A CS Inter-RAT Handover Success Ratio 95.64 96.69 A CS Inter-Frequency HHO Success Rate 97.97 97.95 A PS Inter-Frequency HHO Success Rate 96.18 96.34 A RTWP A PRACH propagation delay(KM) A CS Traffic(Erl) A CS RAB attempt PS RAB attempt A PS traffic(MB)

4 S00102 3G oss kpi justification
Analysis: Cell availability failed in the selected result period main due to cell down time auto caused by neighbor site RW10268 & RA40271 , which had alarms existed then, and after that alarms disappeared.

5 Hammer Project KV020 S-KPI CBO
© Ericsson AB 2016


Download ppt "Hammer Project KV020 S-KPI CBO"

Similar presentations


Ads by Google