Download presentation
Presentation is loading. Please wait.
1
LST Installation Readiness Review
Storage and Testing Area in the SLD Collider Hall (CEH) May 5th 2004 at SLAC Gas System Space Storage Leak Check HV Testing Repairs Cosmic Tests Carsten Hast, EFD For all the Many Involved People
2
Gas System I Control Panel Gas Pad May 5th 2004 Carsten Hast, EFD
3
Gas System II Exhaust Vents Distribution Manifold Safety Bubbler
Pressure Regulator in Pit Exhaust Bubblers May 5th 2004 Carsten Hast, EFD
4
Pit Layout Computer Area Surgery Table HV Racks Storage Area
Staging Area Cabinets May 5th 2004 Carsten Hast, EFD
5
UniStrut structure to hold H-Box stacks in place (needs revisiting)
Storage UniStrut structure to hold H-Box stacks in place (needs revisiting) Cabinets for this and that May 5th 2004 Carsten Hast, EFD
6
Leak Checker Available since ever… May 5th 2004 Carsten Hast, EFD
7
Readout - Computing Flame Retardant Paint IFR Test Stand May 5th 2004
Carsten Hast, EFD
8
Testing – Repairs and Staging
1st (?) z-Plane Big Table H-box Lifting Tool May 5th 2004 Carsten Hast, EFD
9
Cosmic Tests Cosmic Skate Board (3t) Cosmic Stretcher (70 lbs)
May 5th 2004 Carsten Hast, EFD
10
HV System Currently we only have 2 Bertran channels in the pit which makes testing of many channels a little bit tricky… … so we will need to find the solution during this week May 5th 2004 Carsten Hast, EFD
11
Storing and Testing Summary
We are ready Infrastructure is ready Pre-Mixed Gas should come any minute we will need many more HV channels Just send us many many many H-boxes… May 5th 2004 Carsten Hast, EFD