1
MSD’s Second Annual “Can You Dig It?”
$250 Million in Construction and other Contracts
2
Supplier Diversity Disparity Study - Mason Tillman Associates, Ltd
Study is expected to be complete summer 2017. Interim Supplier Diversity “GFE” goals are still in effect 15% MBE 6% WBE FY16 - $40 million with MBE & WBE 20% total spend Supplier Diversity Compliance Field Inspector Sonja Smith
3
Procurement How to Do Business with MSD 4th Wednesday of each Month
9-10 am Main Office location Register – or
4
Goods & Services Bid Opportunities
Upcoming project Legal Services Engineering Services – Morris Forman Security Guard Services Lojic Website Redesign Biomonitoring Service Low Voltage Electrical Service Mechanical Services Mechanical Insulation General Maintenance and Construction Service
5
Still in effect for MSD contracts that have been awarded
Prevailing Wage Still in effect for MSD contracts that have been awarded MSD has not determine how this will effect future projects. Will be discussed at the next Board meeting
6
Projects Schedule to Advertise First Quarter 2017 Note: “Preliminary Estimates” listed in the following are based on initial planning, and are not the final engineer’s estimate Portland CSO Storage Basin 6.9 MG circular concrete storage basin, covered and buried $40 million preliminary estimate 225-feet radius, 45-feet deep 11 Drainage Response Initiative (DRI) projects ranging from $20,000 - $100,000 2 other projects ranging from $10,000 - $600,000
7
Projects Scheduled to Advertise Second Quarter 2017
Ohio River Tunnel 13,400 linear feet of 20-foot finished diameter tunnel 200-feet below ground $140 million preliminary estimate Lexington and Payne CSO Interceptor 5,000 lf of 36 to 102-inch sewer beneath Improved Channel of Beargrass Creek $20 million preliminary estimate Southwestern Parkway CSO Storage Basin 20 MG concrete storage basin, covered and buried $55 million preliminary estimate Progressive Design Build delivery
8
Projects Scheduled to Advertise Second Quarter 2017 (con’t)
I-64 and Grinstead CSO Storage Basin 8.5 MG concrete storage basin, covered and buried $30 million preliminary estimate Cedar Creek WQTC MCC Upgrades Electrical modifications to the Motor Control Center $900K preliminary estimate 4 Floodwall and Levee projects ranging from $100,000 – $800,000 13 DRI projects ranging from $15,000 – $100,000
9
Projects Scheduled to Advertise Third Quarter 2017
Downtown CSO Interceptor 2,000 lf of 12 to 48-inch sewer in Downtown Central Business District $20 million preliminary estimate 24 DRI projects ranging from $10,000 – $100,000
10
Projects Scheduled to Advertise Fourth Quarter 2017
Rowan Street Pump Station (Tunnel Pump Station) 50 MGD pump Station $25 million preliminary estimate Approximately 50 feet diameter, 200 feet deep CMF Roof and Structural Improvements - $1,00,000 12 DRI projects ranging from $20,000 to $65,000
11
Major Projects Anticipated 2018 First or Second Quarter Advertisements
Hite Creek WQTC Expansion 9.0 MGD to 11.5 MG $24 Estimate DRI projects totaling $2.8 million
12
Facility Plan Recommendation
The Facility Plan recommends the following infrastructure investments to address concerns expressed by our community Facility Plan Recommendation FY18-FY22 Wastewater $752,162,720 CMOM $172,153,599 Consent Decree (IOAP) $476,169,371 Development $16,010,000 NMC $87,829,750 Stormwater $256,746,279 Drainage $132,438,516 Floodplain Management $20,100,000 Ohio River Flood Protection $95,835,263 Stormwater Quality (MS4) $8,372,500 Support Systems $51,935,000 Capital Equipment $23,050,000 Facilities $24,210,000 IT $3,100,000 LOJIC $1,575,000 Grand Total $1,060,843,999 You don’t get small city drainage solutions
13
For More Information www.msdlouky.org www.msdbids.com – planroom site
Visit our website and leave your comments: LouisvilleMSD.org/CriticalRepairPlan
14
Thank You For Attending!