Download presentation
Presentation is loading. Please wait.
1
Rail Control Case Study - China
November 2013 © 2013 Mine Site Technologies Revision A
2
Control & Monitoring Station – Control Room
Tele-remote Control and Traffic Management Fixed Video Mobile Video November 2013 © 2013 Mine Site Technologies
3
Locomotive On-board Components
November 2013 © 2013 Mine Site Technologies
4
Fixed Video over MST Network
Low latency network backhaul for multiple HD video streams Camera status monitoring in MineDash November 2013 © 2013 Mine Site Technologies
5
Mobile Video from Locomotive
Low latency network backhaul for multiple HD video streams November 2013 © 2013 Mine Site Technologies
6
Tele-Remote & Status and Payload Monitoring
VIP facilitates on-board PLC communications November 2013 © 2013 Mine Site Technologies
7
© 2013 Mine Site Technologies
11/09/2018 Questions? Request Questions November 2013 © 2013 Mine Site Technologies © Mine Site Technologies 2012
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.