2 ESSIP Plan 2015 / Objective ITY-ADQ
Introduction Explanation and scope Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions Supporting Material Implementation Support Objective Coordinator’s Analysis & Conclusions Links and contacts ESSIP Plan 2015 / Objective ITY-ADQ

3 Why an ITY – ADQ ESSIP objective?
ESSIP Plan 2015 / Objective ITY-ADQ

4 ESSIP Plan 2015 / Objective ITY-ADQ
Explanation and scope ITY ADQ was derived from Regulation (EU) No 73/2010 of 26 January 2010 laying down requirements on the quality of aeronautical data and aeronautical information (Official Journal L23/6, dated ); A new Regulation (EU) No 1029/2014 was approved in 26 September 2014 amending Regulation (EU) No 73/2010. Some definitions were clarified and changed (in accordance with the most recent amendment to ICAO Annex 15) but it has no impact in the content of the ESSIP objective. The aim is to improve the quality of aeronautical data/information in terms of accuracy, resolution and integrity; In accordance with [Article 2(3)] it applies up to the moment when the aeronautical data and/or aeronautical information are made available by the aeronautical information service provider to the next intended user. ESSIP Plan 2015 / Objective ITY-ADQ

5 ESSIP Plan 2015 / Objective ITY-ADQ
Explanation and scope It applies to EATMN systems, their constituents and associated procedures involved in the origination, production, storage, handling, processing, transfer and distribution of aeronautical data/information [Article 2(1)] Following aeronautical products made available by Member States are included [Article 2(1)]: Integrated Aeronautical Information Package (IAIP), with the exception of aeronautical information circulars; Electronic obstacle and electronic terrain data or elements thereof; Aerodrome mapping data. ESSIP Plan 2015 / Objective ITY-ADQ

6 ESSIP Plan 2015 / Objective ITY-ADQ
Explanation and scope In accordance with [Article 2(2)] it applies to: ANSPs and AIS Providers; Operators of those aerodromes and heliports for which IFR or Special-VFR procedures have been published in national aeronautical information publications; Public or private entities providing: Services for the origination and provision of survey data; Procedure design services; Electronic terrain data; Electronic obstacle data. ESSIP Plan 2015 / Objective ITY-ADQ

7 ITY-ADQ ESSIP & IR 73/2010 Affected ADQ IR 73/2010 Key obligations
Parties Chapter I General Provisions NSA Implement data quality and process requirements Chapter II Interoperability & Performance ANSP/AISP Establish formal arrangements APO Chapter III Quality, Safety Security Req. Translated into Public & Private entities Establish consistency mechanisms and implement timeliness requirements Chapter IV Conformity & Additional Req. Implement personnel performance requirements ITY-ADQ ESSIP Chapter V Final Provisions Stakeholder Lines of Action Implement a QMS fulfill safety & security objectives Annexes Supporting material Implement common dataset digital exchange What? Ensure Compliance… How? Implement all data requirements Measurable finalisation criteria ESSIP Plan 2015 / Objective ITY-ADQ

8 Link to European ATM Master Plan
Improved Supply Chain for Aeronautical Data through Common Quality Measures IS 0202 Facilitated Aeronautical Data Exchanges through Digitalised Information IS 0204 ESSIP Plan 2015 / Objective ITY-ADQ

9 ESSIP Plan 2015 / Objective ITY-ADQ
SLoAs ITY-ADQ Decompose IR into main legal obligations Allocate obligations per Stakeholder group Group necessary actions per Stakeholder Link them with IR Articles, Annexes and Timing ESSIP Plan 2015 / Objective ITY-ADQ

10 Most important SLoA(s)
ASP06 - Implement the common dataset and digital exchange format ASP01 - Implement data quality and process requirements APO04 - Implement the common dataset and digital exchange format requirements APO01 - Implement data quality and process requirements IND04 - Implement the common dataset and digital exchange format requirements IND01 - Implement data quality and process requirements REG01 - Verify the compliance with data quality requirements and supervise safety assessments ESSIP Plan 2015 / Objective ITY-ADQ

11 Finalisation criteria
Data quality requirements implemented and documented Certificates (QMS) issued by third parties Formal arrangements between parties EC Declarations & Technical file Safety assessment ITY-ADQ ESSIP Plan 2015 / Objective ITY-ADQ

12 Closed Questions/Finalisation Criteria
Closed questions included in the database are coming from the finalization criteria in the form of a direct question ESSIP Plan 2015 / Objective ITY-ADQ

13 ESSIP Plan 2015 / Objective ITY-ADQ
Supporting Material ITY-ADQ Non-Mandatory: EUROCONTROL Specifications Non-Mandatory: EUROCONTROL Guidelines Non-Mandatory: Material i.e. ISO Standards ESSIP Plan 2015 / Objective ITY-ADQ

14 IMPLEMENTATION SUPPORT
The EUROCONTROL ADQ Implementation Support Cell was set up to assist the States with the implementation of the Aeronautical Data and Information Quality (ADQ) implementing rule in the following keys areas: Support to the establishment and provision of means of compliance; Support to the implementation of the provisions of the implementing rule; Support to the National Supervisory Authorities; Support to the overall implementation and compliance monitoring process. Any question with regard to the ADQ IR can be addressed to the Implementation Support Cell at: or Tel: ESSIP Plan 2015 / Objective ITY-ADQ

15 ESSIP Plan 2015 / Objective ITY-ACID
ESSIP Report 2014 ESSIP Plan 2015 / Objective ITY-ACID

16 Objective Coordinator’s Analysis & Conclusions
New objective based on a complicated regulation to address/solve a data quality problem Challenging for implementation due to the large spectrum of data/information May imply significant investments and/or adaptations of existing systems Involves a large group of stakeholders including industry/manufacturers Too much regulation and many administrative tasks (overregulation?) required ESSIP Plan 2015 / Objective ITY-ADQ

17 ESSIP Plan 2015 / Objective ITY-ADQ
Links and contacts Objective Coordinator: Frangolho A-P., DSS Objective Expert(s): Unterreiner M., Implementation Support Cell: Tel: ESSIP Plan 2015 / Objective ITY-ADQ


Download ppt "Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR"

Similar presentations


Ads by Google