Presentation is loading. Please wait.

Presentation is loading. Please wait.

ADS San Antonio Closing Report

Similar presentations


Presentation on theme: "ADS San Antonio Closing Report"— Presentation transcript:

1 802.11 ADS San Antonio Closing Report
November 2004 ADS San Antonio Closing Report Jesse Walker Jesse Walker, Intel Corporation

2 San Antonio Meeting Accomplishments
November 2004 San Antonio Meeting Accomplishments Developed draft text for a PAR ( /02) Assigned development of draft text for the 5 Criteria document. 5 Critieria to be posted by January 10, 2005 Heard presentation by Jon Edney suggesting requirements for the PAR Jesse Walker, Intel Corporation

3 Meeting Objectives for Monterey
November 2004 Meeting Objectives for Monterey Finish PAR and 5 Criteria Review presentations Jesse Walker, Intel Corporation

4 SG: Moreton/Housley Result: 18-0-0 WG: Result ExCom: Result
November 2004 Motion From IEEE WG to IEEE 802 Executive Committee for Study Group Extension Motion: To request the Working Group to extend the ADS Study Group through the March 2005 meeting and forward to the Executive Committee for Approval. Movers: SG: Moreton/Housley Result: WG: Result ExCom: Result Jesse Walker, Intel Corporation


Download ppt "ADS San Antonio Closing Report"

Similar presentations


Ads by Google