Download presentation
Presentation is loading. Please wait.
Published byCharity Shelton Modified over 6 years ago
1
Lessons learned from the preparatory process for licensing of the new nuclear units in Hungary
János Krutzler Hungarian Atomic Energy Authority Department of Project Affairs
2
Content Hungary’s new NPP project Regulatory system in Hungary
Some lessons learned International Conference on Topical Issues in Nuclear Installation Safety
4
New NPP project Planned units 2 x VVER-1200 Operating units
5
Hungary’s new NPP project so far
Intergovernmental Agreement (IGA) About the cooperation on the peaceful use of nuclear energy 14 January 2014 Act II/2014 About the announcement of the IGA, in force on 12 February Hungary’s new NPP project so far The idea of NPP extension has been on the agenda since the 80’s (2*1000 MW additional capacity was planned for the site); 2008: energy policy conception: based on supply security and climate-protection objectives, the decision preparation work for new units started; 30th March, 2009: decision-in-principle of the Hungarian Parliament; January 2014: Intergovernmental agreement on the peaceful use of nuclear energy by Russia and Hungary: Two VVER-1200 type reactors at the Paks site; Russian loan for the 80% of construction costs; 7th December, 2014: Implementation agreements singed: EPC contract; Operation and maintenance support contract; Agreement detailing fuel supply and the handling of spent fuel. 12 February 2014 Intergovernmental Agreement (Financial IGA) About the interstate loan for the extension of Paks NPP 28 March 2014 Act XXIV/2014 About the announcement of the FIGA 23 June 2014 Implementation agreements signed by Paks II Nuclear Power Plant Development C-JSC and the Russian Joint-Stock Company Nizhny Novgorod Engineering Company Atomenergoproekt 7 December 2014 International Conference on Topical Issues in Nuclear Installation Safety
6
Regulatory system in Hungary
International Conference on Topical Issues in Nuclear Installation Safety
7
Regulatory Framework in Hungary (licensing before construction)
Principal decision of the Parliament Principal/Preliminary licensing stage Principal license for water usage* Site License** Environmental License*** Principal license for the electric grid connection**** Main licensing stage License for water usage* Construction License** Electric Energy Generation License**** * Responsibility of the South-Transdanubian Water Management Directorate ** Responsibility of the Hungarian Atomic Energy Authority *** Responsibility of the Government Office for Baranya County **** Responsibility of the Hungarian Energy and Public Utility Regulatory Authority International Conference on Topical Issues in Nuclear Installation Safety
8
Main licensing areas of HAEA
Safety Security Safeguards Site Evaluation Licensing of Site Investigation and Evaluation Licensing of the Site Construction licence Licensing on level of SSCs Commissioning licence Operational licence Determination of Design Bases Threats Licensing of the Physical Protection Plan Preliminary supplying data Safeguards registration (7m prior the fuel) Site Licensing Construction Commissioning Operation International Conference on Topical Issues in Nuclear Installation Safety
9
Some lessons learned International Conference on Topical Issues in Nuclear Installation Safety
10
The Nuclear Safety Regulation in Hungary
Act No. CXVI/1996 about Nuclear Energy The Nuclear Safety Regulation in Hungary Gov. Decree No. 118/2011 Nuclear Safety Code Other regulations Legally binding 1 2 3 … … 9 10 Non legally binding Safety Guidelines Local Regulations International Conference on Topical Issues in Nuclear Installation Safety
11
Structure of the Nuclear Safety Code (NSC)
Research and Training Reactors Spend Fuel Storage Facilities NPPs Volume 1. – Nuclear safety authority procedures of nuclear facilities Structure of the Nuclear Safety Code (NSC) Volume 2. – Management systems of nuclear facilities Volume 3. Design require-ments for operating NPPs Volume 3A. Design requirements for new NPPs Volume 5. Design and Operation of Research and Training Reactors Volume 6. Design and Operation of Spend Fuel Storage Facilities Volume 4. Operation of NPPs Volume 7. – Siting of Nuclear Facilities Volume 8. – Decommissioning of Nuclear Facilities Volume 9. – Construction of New Nuclear Facilities Volume 10. – Terminology International Conference on Topical Issues in Nuclear Installation Safety
12
Differentiation of requirements: Examples
Screening values for natural hazards to be considered in the design basis [1/year] Cumulative Core Damage Frequency (CDF) [1/year] Existing NPP (Gen II) 10-4 < 10-4 New NPP (Gen III+) 10-5 < 10-5 Safe Shutdown Earthquake values for the Paks site (PGA) Existing NPP (Gen II) 0,25 g New NPP (Gen III+) 0,34 g International Conference on Topical Issues in Nuclear Installation Safety
13
Specific requirements for design and construction (Examples)
Design adaptation: It has to be ensured that codes and standards from different countries and/or organisations form a consistent requirement system, minimising overlaps and unregulated areas. Requirement management: HAEA has to deal with more than paragraphs of legally binding requirements. To help easier handling of such a large amount of information specialized software tools are necessary. Supply chain management: Past and current NPP construction project have show why this is important. Robust requirements for the licensees’ „intelligent customer” capabilities should be implemented and enforced early on in the project, even during the design phase. International Conference on Topical Issues in Nuclear Installation Safety
14
Estimated Licensing Milestones
Site Investigation and Evaluation License Site License Construction License CLA*: 2018 Q3 Operational License Commissioning License ??? ??? * = Submission of the Construction License Application International Conference on Topical Issues in Nuclear Installation Safety
15
Public involvement Photo: István Huszti / index.hu International Conference on Topical Issues in Nuclear Installation Safety
16
Other areas of interest
EPC contract vs. licensees ultimate responsibility; Effect of construction on the safe operation of nearby nuclear facilities; Use of lessons learned from other project; Challenges for the regulatory body; Cooperation with other licensing authorities; International cooperation with regulatory bodies; International Conference on Topical Issues in Nuclear Installation Safety
17
Thank you for your attention!
Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.