1 Shipping (#4) of the components for 100’s Head welding.
2006 year. Shipping (#3) of the rest of equipment + materials for 40’s BLM production in April. 22.02 – Shipping Request created in EDH. 23.02 – The documents registered in qualiac. Attachment #3 signed by L.Evans and transferred to IHEP Director N.Tyurin for signature. 01.03 – 23 packages/10335 kg and CERN documents was ready to go. 17.03 – Transport by Direct Truck from CERN. 29.03 – Packages was unloaded in IHEP. Shipping (#4) of the components for 100’s Head welding. – Shipping Request created in EDH. 03.03 – The documents registered in qualiac. Attachment #4 signed by L.Evans and transferred to IHEP Director N.Tyurin for signature. 03.03 – 1 case/50 kg and CERN documents was ready to go. Transport by Direct Truck from CERN. Shipping (#5) of the components for 360’s BLM production in May, including the components for 400’s Head welding. – Shipping Request created in EDH. – The documents registered in qualiac. Attachment #5 was signed by P.Bryant and IHEP Director N.Tyurin. – 3 packages/701 kg was collected by Internal Transport and CERN documents was ready to go. 23.03 – Transport by Groupage Truck from CERN. 13.04 – Packages was unload in IHEP

2 Shipping (#6) of the components for 360’s BLM production in June, including the components for 300’s Head welding. – Shipping Request created in EDH Attachment #6 signed by L.Evans and transfered to IHEP Director N.Tyurin for signature. packages/875 kg and CERN documents was ready to go. Transport by Groupage Truck from CERN. 06.05 – Packages was unload in IHEP Shipping (#7) of the components for 360’s BLM production in July, including the components for 1200 Heads welding (July, August, September) and 250 UK Heads. 18.05 – Shipping Request created in EDH Attachment #7 signed by P.Bryant and transfered to IHEP Director N.Tyurin for signature. 23.05 – The documents registered in qualiac. packages/2305 kg was collected by Internal Transport . CERN documents was ready 31.05 Transport by Groupage Truck from CERN. Shipping (#8) of the components, Detergent and vacuum equipments, including the 50 UK Heads. 8.06 – Shipping Request created in EDH Attachment #8 signed by P.Bryant and transfered to IHEP Director N.Tyurin for signature. packages/xxx kg was collected by Internal Transport and CERN documents was ready to go. xx Transport by Groupage Truck from CERN

3 12.06.06 The rest of all components for 3800IC production is enough
# 1 Description 2 Qty per IC exist in CERN after last Shipping 3 Qty per IC which was send to IHEP, including p3 4 Production month with enough Qty (360 IC/month from May,06) Total amount of IC is 3800 * Rest Qty/IC for sending (not get in CERN) 1. Ceramics 350 3000 Dec06 400 Spacers type A 136 2031 Oct06 1769 Spacers type C 1767 Sep06 2033 Tighteners type A 3445 Jan07 355 5 Bottom cover spacer 3592 Feb07 208 6 Rods, L=85 mm 3179 621 7 Tighteners type B 2611 Nov06 1189 8 Heads **: From UK 347 1453 9 From Protvino 2000 The rest of all components for 3800IC production is enough * Qty of IC :3800 ->4020 : qty of the components is increased ** Components for welding Heads is not enough

4 12.06.06 N shipping Month for production in Protvino
Date of the shipping IC to product Shipping of the materials 3 Apr 17.03 40 + 5 May 23.03 360 6 June 18.04 7 July 31.05 1.Heads – 250 pc + 2.Spacer type A + 3.Tighteners A + 4.Tighteners B + 5.Alumina tube + 6.Ceramics disks + 7. Components for Heads welding 8 Aug June 15 1.Ceramics disks+ 2.Spacers+ 3.detergent+ 4.Spare of vacuum equipment+ 9 Sep July 15 10 Oct August 15 11 Nov September 15 12 Dec 440