1 Tunnel Cross Section Studies
CES 8 July 2009 Tunnel Cross Section Studies

2 4.5m tunnel used as baseline for 2007 costing exercise

3 What has changed since 2007 :
3d studies with CATIA integrating services Cooling and Ventilation studies Transport studies Machine developments….

4 CTC 19 May Proposal : 5.6m tunnel
2270mm

5 Further to CTC of 19 May : Drain reintroduced into tunnel invert to collect any water ingress from surrounding rock 3 ‘missing’ cable trays re-introduced Machine height for installation reduced to 2100mm (from 2270 = -170mm) Transport studies advanced with new machine details Local tunnel enlargements proposed where turnaround re-enters the main Linac Transversal ventilation has been retained for this study, pending CTC decision

6 Option B selected for this study

7 4.5m tunnel Machine height reduced, but still a conflict

8 Catia Studies Could re-position the tunnel enlargement to where
the turnaround re-enters the Main Linac Catia Studies

9 4.5m tunnel Tunnel enlarged at Turnarounds

10 4.5m tunnel Move transfer lines to side of tunnel ?

11 BACK-UP slides

12 Five machine beams in this cross section
Catia Studies

13 Extract from CLIC Technical Committee :
G. Riddone, D. Schulte,

14 To dump Drive beam

15 Beginning Of turnaround loop End of turnaround loop Main beam

16 Transport Studies

17 4.5m tunnel Turnaround & transport Studies RIGHT VIEW
Main beam Drive beam 2 CV pipes 250mm Turnaround loop Monorail 3 cable trays 520mm 2 CV pipes 600mm Turnaround & transport Studies Safe passage Drive beam Transport train RIGHT VIEW TYPICAL CROSS SECTION CLIC TUNNEL Main beam

18 Possible Ventilation Systems for road tunnels
Extracted courtesy of ‘French Tunnelling Association : AFTES : Tunnels routiers : resistance au feu Jan 2008’

19 CLIC Ventilation Concepts Advantages of transversal ventilation :
Safety (see CLIC note from F.Corsanego EDMS ) Much better control of temperature & humidity gradient along the tunnel CLIC

20 6.0m diameter needed to accommodate 3m2 ducts !

21 TYPICAL CROSS SECTION CLIC TUNNEL – CV 2x1m2
Main beam Drive beam Extraction 1m2 Air supply 1m2 3 cable trays 520mm Monorail Transport train CV pipes 600 & 700mm Circuit A Safe passage CV pipes 250 & 700mm Circuit B Drive beam Main beam RIGHT VIEW TYPICAL CROSS SECTION CLIC TUNNEL – CV 2x1m2

22 CLIC WORKSHOP - Ventilation
Tunnel section SUPPLY DUCT EXTRACTION DUCT Circuit C : Fire Fighting Circuit B : general cooling Circuit D : compressed air Circuit A : Module cooling

23 CLIC WORKSHOP - Ventilation
Safety considerations Extraction Air supply Extraction Air supply SHAFT POINT Control of the pressure from both ends of a sector. Control of the pressure (overpressure or underpressure in each area). Fire detection per sector compatible to fire fighting via water mist.

24 CLIC Cooling Study Proposed 1.5m diameter micro-tunnel for Cooling Pipes : Approx. cost for CE works 250MCHF Intermediate caverns would be needed for construction of micro tunnel Integration for cooling pipes is complicated Major impact on civil planning (excavated spoil through ‘completed’ structures) J.Osborne

25 Herrenknect Visit June 2008
Herrenknect are one of the worlds biggest TBM manufacturers. They advised that the most common diameter for TBM’s (metro etc) is 5.6 finished internal diameter.

26 4.5m compared to 6.0m diameter
Cross Section Studies 4.5m compared to 6.0m diameter

27

28 Drive beam from Turnarounds missing from this cross section !
4.5m tunnel Drive beam from Turnarounds missing from this cross section !

29 Drive beam from Turnarounds missing from this cross section !
5.0m tunnel Drive beam from Turnarounds missing from this cross section !

30 5.6m tunnel

31 Summary With a 4.5m diameter tunnel, it appears difficult to accommodate all equipment 5.6m recommended by CES working group More TBM’s of this diameter available will help with Project planning Reduction in other costs due to more additional working space ? Space for future requests…. Additional CE cost in the region of 150M CHF Barcelona Metro under construction 6.6m machine external, inner 5.8m. With 0.1m tolerance on radius = 5.6m internal diameter.