Presentation is loading. Please wait.

Presentation is loading. Please wait.

Automated Transit Network Opportunities

Similar presentations


Presentation on theme: "Automated Transit Network Opportunities"— Presentation transcript:

1 Automated Transit Network Opportunities
Smart Commute Transforum Erie, Colorado June 19, 2017 Peter J. Muller, P.E., M.ASCE President PRT Consulting, Inc. and the Advanced Transit Association

2 Agenda Automated Transit Networks (ATN) Vision
ATN State-of-the-Industry ATN for Smart Commute Metro North (SCMN)

3 Automated Transit Networks (ATN) Vision

4 Citylink …Hyperloop’s missing link

5

6

7 Severe Free-flowing Congestion 10 20 30 40 50 Time (years)
Severe Impact on Congestion Free-flowing Time (years) Severe Free-flowing Congestion Source: ITS International

8

9

10

11

12

13

14

15 Cornell & Muller. US Utility Patent No. 9,085,375 B2

16

17

18

19 4 stations 42,000 daily $2.3 B Loses money 41 stations 195,000 daily $0.86 B Profitable

20

21

22 Citylink …improving the quality of life

23 ATN State-of-the-Industry

24 Existing ATN Systems 2getthere, Masdar City, UAE Ultra, Heathrow Airport, UK Vectus, Uppsala, Sweden Vectus, Suncheon, Korea getthere, Rivium, The Netherlands Modutram, Guadalajara, Mexico

25 2getthere (The Netherlands)
Deployed 2010 Speed 25 mph Range 37 miles Power Battery Passengers 4 Capacity 2,880 pphpd

26 2getthere (The Netherlands)
Deployed 1999 Top speed 37 mph Range 31 miles Power Battery Passengers Capacity 13,000 pphpd 0.5 min, 26. This system is installed in the Netherlands (upper picture). A new large deployment with 3rd generation vehicles (lower picture) is occurring in Taiwan. 12 seated plus 12 standees

27 Modutram (Mexico) Deployed Demo Speed 33 mph Range 24 miles
Power Battery Passengers 6 Capacity 4,000 pphpd

28 Ultra (United Kingdom)
Deployed 2011 Speed 25 mph Range 12 miles Power Battery Passengers 4 Capacity 2,400 pphpd

29 Vectus (Korea) Deployed 2013 Speed 40 mph Range unlimited
Power Wayside Passengers 6 + 3 Capacity 7,200 pphpd

30 ATN for Smart Commute Metro North (SCMN)

31 124th LEGEND SCMN BNDRY RTD RAIL

32 HWY 7 LEGEND RTD RAIL ATN AT-GRADE ATN ELEVATED 124th – HWY 7 = 14 mins 124th

33 ATN/Rail Comparison 124th to Highway 7
Weekday ridership 10,000 Stations 12 2 Highway 7 to DUS (ride time) 41 minutes 36 minutes Headway (peak/off-peak) 1 minute 20/30 minutes Capital cost $180 M $263 M Operating cost per rider $3.20 NA 1. Source: RTD

34 LONGMONT LEGEND ATN AT-GRADE ATN ELEVATED 124TH – Longmont = 47 mins Capital Cost - $600 - $800 M HWY 7 124th

35

36 124th LEGEND RTD RAIL ATN AT-GRADE ATN ELEVATED 124th – DUS = 25 mins (27 by rail) Capital Cost = $800 - $1,050 M DUS

37 LONGMONT HWY 7 124th LEGEND SCMN BNDRY ATN AT-GRADE ATN ELEVATED RTD RAIL Longmont – DUS = 68 mins (45 – 70 mins by car) DUS

38 Automated Transit Network Opportunities
Smart Commute Transforum Erie, Colorado June 19, 2017 Peter J. Muller, P.E., M.ASCE President PRT Consulting, Inc. and the Advanced Transit Association


Download ppt "Automated Transit Network Opportunities"

Similar presentations


Ads by Google