Download presentation
Presentation is loading. Please wait.
1
EVN TOG-meeting Onsala Space Observatory
June 27-28, 2012
2
EVN TOG-meeting, OSO, June 27-28, 2012
Мероприятия: June 27, Workshop, focused on the DBBC June 28, TOG-meeting Участники: Sweden, Finland, Germany, Netherlands, Russia, Poland, Italy, Spain, Latvia China, Korea, South Africa, UK, USA
3
EVN TOG-meeting, OSO, June 27-28, 2012
June 27, Workshop, focused on the DBBC Докладчик Тема доклада / сообщения M. Lindqvist Local Arrangements/Opening Remarks G. Tuccari General presentation of the DBBC system with the hardware functionalities of all the sections G. Tuccari, M. Wunderlich DDC (tunable configuration) description and command set, optimization and system testing PFB (polyphase fixed configuration) description and command set, optimization and system testing FILA10G description and command set. SPECTRA (spectrometer), description and command set, optimization and system testing M. Wunderlich DBBC - Spare parts and maintenance A. Bertarini DiFX for zero baseline tests and more E. Himwich FS implementation for the DBBC H. Verkouter Mark5C usage for 2 and 4 Gbps recording A. Mujunen NEXPReS WP8 FlexBuff D. Smythe Mark6 M. Taveniku XCube + demo
4
EVN TOG-meeting, OSO, June 27-28, 2012
5
EVN TOG-meeting, OSO, June 27-28, 2012
6
EVN TOG-meeting, OSO, June 27-28, 2012
June 28, TOG-meeting Направление Докладчики Reliability/Performance of the EVN Yang, Tenkink, Leewinga Amplitude Calibration Yang, Keimpema, Lindqvist Digital BBC-systems (DBBC, R1002, CDAS) Tuccani, Bach, Lindqvist, Bezrukovs,Campbell, Nosov, Zhao JIVE Szomoru 2-4 Gbps observations EVN, EVN+VLBA Szomoru, Verkouter, Bach, Lindqvist, Tuccani Haystack Smythe Mark 5 Smythe, Lindqvist NRAO Romney Sched Developments Campbell Field System, status and new features Himwich Technical priorites for the EVN Szomoru, Lindqvist, Campbell Activities at EVN stations (all) All Activities at potential new EVN stations Bezrukovs, Taehyun Jung RadioNet3 Lindqvist
7
EVN TOG-meeting, OSO, June 27-28, 2012
• Cloud correlation: • TUM and MPG making good progress • Tool for system monitoring/alerting in place • High bandwidth on demand • Standard has been decided upon • Successful BoD demo Onsala-JIVE, Jodrell Bank-Metsahovi at 4Gbps • Providing NRENs with use case • Computing in a shared infrastructure • Many new features added to SFXC • Demonstration of automated triggered observation very succesful • High-bandwidth, high-capacity networked storage • Hardware platform purchased at many sites • Speed of development has picked up considerably
8
EVN TOG-meeting, OSO, June 27-28, 2012
Доступные ресурсы: Login / password: Iaa / alfresco Repository -> Guest Home -> EVN -> . . .
9
EVN TOG-meeting, OSO, June 27-28, 2012
10
WVR Расчет влажной компоненты тропосферной задержки распространения радиосигнала Семейство радиометров в OSO Обработка результатов наблюдений радиометров в OSO On-line доступ к РВП в РАО «Светлое» Обработка результатов наблюдений радиометров в ИПА
11
OSO
12
WVR
13
WVR
14
WVR
15
WVR
16
WVR Series Processing
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.