General Issues We will need to understand infrastructure requirements
We will be providing a document to define the laboratory/experiment interface Possible locations at 4850 level Davis cavern (interference with LUX?) Drift adjacent to Yates shaft New excavation What are timing requirements?
2
4850L (+118m) Conceptual Layout, Plan View
Existing Drifts Lab Modules Rhyolite Intrusions Yates Shaft Yates Unit Poorman Formation Neutrino Detectors Ross Shaft
3
(Future Lab Module Access)
4850L (+118m) Conceptual Layout, Plan View Yates Shaft Existing Drifts Muck Bays for Excavations (Future Lab Module Access) New Drifts at 4850L Lab Modules Neutrino Detectors 53m dia. x 45m vert. New Drifts at 5000L Ross Shaft
4
4850L (+118m) Conceptual Layout, Plan View
Yates Shaft Existing Drifts Lab Module 2 20m horiz x 20m vert x 100m long Lab Module 1 20m x 20m x 50m long Neutrino Detector Access Drifts and User Area 20m horiz x 12m vert New Drifts at 5000L 6m horiz x 4m vert New Drifts at 4850L 6m horiz x 5m vert Ross Shaft
5
Lab Module Concept with Water Shield Facility (WSF)
20m x 20m x 75m “D” Shaped Cavern Exit Drift Lab Module Cavern Entrance Drift
6
Lab Module Concept with WSF, Cavern Back Removed
(20m x 20m x 75m “D” Shaped Cavern) Water Tanks 12m dia. x 12m height Experiment Support Rooms Clean Room Transition Areas
7
LUX Experiment with LBF
Prep/Control Room LUX Experiment 4851.8L 4850L LBF 4874L
8
Majorana Experiment at 4850L
To Davis Lab Yates Shaft Area Cu Electro-Forming Waste Dump Ore Dump Majorana Experiment To Ross Shaft
9
Majorana Experiment at 4850L, Plan View
Cu Electro-Forming Clean Room (79 ft. x 16 ft.) Assembly Clean Room (21 ft. x 16 ft.) Clean Room Transition (13 ft. x 17.6 ft.) Machine Shop Clean Room (21ft. X 16 ft.) Clean Room Transition (14 ft. x 8 ft.) Clean Room ( 107 ft. x 8 ft.) To Ross Shaft Majorana Experiment