Download presentation
Presentation is loading. Please wait.
Published byValerie Edwards Modified over 6 years ago
1
SAP Value Assurance plan and safeguard service package for SAP SuccessFactors HCM Suite
Business Needs Need to follow leading practices and reduce risk of project failure Need to assure the right design, architecture and configuration of the implementation project End to End Solution Validation Need to safeguard the risks and issues of partner led implementation project Optional: Planning Roadmap, implementation strategy and deployment plan from Cloud Software Vendor Delivery Approach and Scope Safeguarding Safeguarding of Partner-/Customer-led implementation project of SAP SuccessFactors Employee Central Continuous SAP expert involvement throughout the implementation project Formal SAP Solution-Design-, Functional-Design- and Technical-Integration-Review-Reports at the end of the respective project phases Conduct workshops to analyze customer‘s business strategy and advice on scope, design, architecture and deployment plan for a implementation project of SAP SuccessFactors Value and Benefits Minimized risks and safeguarded quality gates support a successful go-live Optional (Planning): Maximized transparency and specific roadmap supporting your strategy Short description This service package provides advice and guidance in partner/customer led Employee Central implementation projects on Solution Design, Functional Design and Technical Integration. It supports the partner/customer led implementation project throughout the entire implementation project with a continuous involvement and support as well as formal review reports on certain milestones. Basically it reduces implementation risks and does an end to end solution validation. Optionally before the partner led implementation project a planning service can be delivered, which conducts workshops to analyze the customer situation and deliver an advise on the scope of the Cloud Service project, Design, Architecture, Business Process design recommendations and phased/prioritized deployment plan.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.