Download presentation
Presentation is loading. Please wait.
Published byNicholas Tate Modified over 6 years ago
1
Single Site Acceptance Report for TIGO UMTS Project Phase II
NodeB: VALLA MONTES DE SAN BARTOLO 3GVMSB PSC: 180, 181, 182 Date: 19 - OCTUBRE Huawei El Salvador
2
Contents 1 RSCP Before/After (CS and PS) 2
Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set Before/After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accesibility & Retainability) Before/After 8 HSDPA Parameter 9 Data of Design of the New Site
3
CS RSCP – 3GVMSB Before
4
CS RSCP – 3VMSB After
5
PS RSCP – 3GVMSB Before
6
PS RSCP – 3GVMSB After
7
Contents 1 RSCP Before/After (CS and PS) 2
Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set Before/After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accesibility & Retainability) Before/After 8 HSDPA Parameter 9 Data of Design of the New Site
8
CS Ec/Io – 3GVMSB Before
9
CS Ec/Io – 3GVMSB After
10
PS Ec/Io – 3GVMSB Before
11
PS Ec/Io – 3GVMSB After
12
Contents 1 RSCP Before/After (CS and PS) 2
Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set Before/After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accesibility & Retainability) Before/After 8 HSDPA Parameter 9 Data of Design of the New Site
13
3GVMSB Best SC in Active Set Before
14
3GVMSB Best SC in Active Set After
15
Contents 1 RSCP Before/After (CS and PS) 2
Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set Before/After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accesibility & Retainability) Before/After 8 HSDPA Parameter 9 Data of Design of the New Site
16
3GVMSB RSCP Sector A, B and C
17
3GVMSB SC 180 RSCP Sector A
18
3GVMSB SC 181 RSCP Sector B
19
3GVMSB SC 182 RSCP Sector C
20
Contents 1 RSCP Before/After (CS and PS) 2
Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accesibility & Retainability) Before/After 8 HSDPA Parameter 9 Data of Design of the New Site
21
CS Active Set After
22
CS Monitor Set After
23
Contents 1 RSCP Before/After (CS and PS) 2
Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set Before/After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accesibility & Retainability) Before/After 8 HSDPA Parameter 9 Data of Design of the New Site
24
Intra Frequency Handover
25
3GVMSB CS SHO Before
26
3GVMSB CS SHO After
27
3GVMSB PS HHO Before
28
3GVMSB PS HHO After
29
Contents 1 RSCP Before/After (CS and PS) 2
Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set Before/After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accessibility, Retainability & Static) After 8 HSDPA Parameter 9 Data of Design of the New Site
30
Accesibility Statistics
31
Retainability
32
Static Test Per Sector (Video Call) Sector A
33
Static Test Per Sector (R99) Sector A
34
Static Test Per Sector (Video Call) Sector B
35
Static Test Per Sector (R99) Sector B
36
Static Test Per Sector (Video Call ) Sector C
37
Static Test Per Sector (R99) Sector C
38
3GVMSB RSCP Histogram Before
39
3GVMSB RSCP Histogram After
40
3GVMSB Ec/Io Histogram Before
41
3GVMSB Ec/Io Histogram After
42
Contents 1 RSCP Before/After (CS and PS) 2
Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set Before/After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accesibility & Retainability) Before/After 8 HSDPA Parameter 9 Data of Design of the New Site
43
HSDPA Delta Served Rate (kbps) Before/After
8.1
44
3GVMSB HSDPA Delta Served Rate Before
45
3GVMSB HSDPA Delta Served Rate After
46
HSDPA HS-DPCCH CQI Before/After
8.2
47
3GVMSB HS-DPCCH CQI Before
48
3GVMSB HS-DPCCH CQI After
49
Contents 1 RSCP Before/After (CS and PS) 2
Ec/Io Before/After (CS and PS) 3 Best Server in Active Set Before/ After 4 RSCP per PSC 5 CS Active Set and Monitor Set Before/After 6 CS SHO - PS HHO Before/After 7 Statistical Data (Accesibility & Retainability) Before/After 8 HSDPA Parameter 9 Data of Design of the New Site
50
Data of Design of 3GVMSB NODEB NAME NODEB ID CELL ID NEW SITE PSC
Azinuth M-Tilt E-Tilt Tower height (m) Antenna Type 3GVMSB 5178 51781 VALLA MONTES DE SAN BARTOLO 180 90 6 18 DBXLH-6565A-VTM 51782 181 220 11 51783 182 345 8
51
Thank You Thank You Thank You www.huawei.com www.huawei.com
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.