Presentation is loading. Please wait.

Presentation is loading. Please wait.

NA62 - GTK Procedure to switch ON/OFF the Cooling Plant version 0

Similar presentations


Presentation on theme: "NA62 - GTK Procedure to switch ON/OFF the Cooling Plant version 0"— Presentation transcript:

1 NA62 - GTK Procedure to switch ON/OFF the Cooling Plant version 0
Introduction This procedure is rather a preparation of the Stations for the switching ON/OFF, while the actual power ON/OFF is done by EN-CV personnel. The Cooling Plant operates on three Stations, thus the procedure to prepare the switching ON/OFF of the Plant has to be repeated three times, once for each Station. The sketch of a Station is the following: Vi Detector Vb Vo By-pass

2 1) Preparation to switch ON the Cooling Plant
Close Vi (*) Open Vo Open Vb After this operation, the Detector is in a safety state and the liquid would go through the by-pass 2) Switch ON the Cooling Plant Whenever the Cooling Plant is stable (one minute or so) with pressure and flow at the nominal values, one can switch from by-pass to Detector by doing the followings: Open Vo Open Vi Close Vb (*) Open(ON)/Close(OFF): handle position

3 3) Switch OFF the Cooling Plant
The switch off of the Cooling Plant should not do any arm to the Detector. The good practice would be, before switching off: Close Vi Open Vo Open Vb Leaving the system ready to be switched ON again (see 1).


Download ppt "NA62 - GTK Procedure to switch ON/OFF the Cooling Plant version 0"

Similar presentations


Ads by Google