Download presentation
Presentation is loading. Please wait.
1
FINANCE
2
AGEING OF AUC DIV WBS ELEMENT DESCRIPTION AMOUNT AGEING CM
Tower work THALASERRY-RP-00119 169598 > 2 YEARS CM/14/ BTS installation MAMAKUNNU-RP-04036 337598 CM/14/ Tower work Alinkeezhil 850449 CM/14/ BTS installation KANNURBSNLBHAVAN-RP-07948 374673 CM/14/ Tower work KOTTAPURAM-RP-08521 509616 CM/14/ Tower work Thokkilangadi 113133 CM/14/ Procuring WiMax Eqpt 820198 CM/14/ Procuring WiMax CPE 199437
3
Instln of ADM CPE CONF B various SITES 103980
CM CM/15/ Installation of STM-1 CPE at various GSM <2 AND >1 YEAR CM/15/ CM/15/ CM/15/ CM/15/ Laying OFC to Panthottam GSM CM/15/ I and C of STM1 CPE at various GSM sites CM/15/ CM/15/ CM/15/ Laying OFC to Kadachira town GSM CM/15/ Laying OFC to Nadal GSM site CM/15/ laying OFC to Poochakkad GSM site CM/15/ laying OFC to Athinjal GSM CM/15/ laying OFC to KEL Kasaragod GSM CM/15/ Installation of ADM CPE CONF A GSM SITES CM/15/ CM/15/ Instln of ADM CPE CONF B various SITES 103980
4
LAYING OFC TO KOLMOTTA GSM 898928.18 <1 YEAR > 6 MONTHS
CM CM/15/ LAYING OFC TO KOLMOTTA GSM <1 YEAR > 6 MONTHS CM/15/ laying OFC to Koyamkara GSM <6 MONTHS CM/15/ Laying ofc to kolathuvayal GSM CM/15/ laying OFC to Kannapuram GSM CM/14/ Laying OFC CV CV/16/ Providing DG foudn at Kidanji GSM Site CV/16/ Prvdg DG Foundn at Kuthuparamba S/Q GSM EV EV/15/ SITC 15KVA EA BTS RAYAROM <2 AND >1 YEAR EV/15/ SITC 15KVA EA BTS ANJARAKANDY EV/15/ 24 Nos SAC various TE bldgs Under KNRSSA EV/15/ SITC 15KVA EA BTS PANANGAD-08512 EV/15/ SITC 15KVA EA TROLLY BSS DN KASARAGOD 712075 EV/15/ SITC 1+1 X7TR PAC MICRO TE UPPALA-REPL
5
SITC 15KVA EA BTS PULLUMALA 349815.42 <6 MONTHS EV/15/003857.01
SITC 15KVA EA BTS MOGRAL PUTHUR EV/15/ SITC 15KVA EA BTS NH JN KANHANGAD-08505 EV/15/ SITC 15KVA EA BTS KANHANGAD NBS-08291 EV/15/ SITC 15KVA EA BTS ANCHAM MIL EV/15/ SITC of 15KVA DG BTS MULLASSEERY 343000 EV/15/ SITC 15KVA EA BTS MUscoT HOTEL PAYYABALM EV/15/ EI & F, MB, AOL BTS KANHANGAD NBS-08291 EV/15/ 3 X1.5 TR SAC- TE THERTHALLY- REPLACE EV/15/ 3 X1.5 TR SAC- TE PERUMPADAVU- REPLACE EV/15/ 3 X1.5 TR SAC- TE MANAKADAVU- REPLACE EV/15/ 3 X1.5 TR SAC- TE ARIVILANAJPOIL- REPL 60035 EV/15/ 3 X1.5 TR SAC- TE ALACODE -REPL EV/15/ 3 X1.5 TR SAC- TE CHORUKALA- REPLACE EV/15/ 3 X1.5 TR SAC- TE VELLUR- REPLACEMENT EV/15/ 8 x1.5 TR SAC TE THLIPARAMBA- REPL. PAC EV/15/ 7 x1.5TR SPLIT AC MBM CDOT TALIPARAMBA-R EV/15/ SITC 15KVA EA TROLLY BSS DN KANNUR 25125
6
Laying OFC along with NFS work 259645.17 <2 AND >1 YEAR
FA FA/15/ Laying OFC along with NFS work <2 AND >1 YEAR FA/15/ FA/15/ FA/15/ laying ofc from kng south to Madiyan FA/15/ EXTENDING OFC TO SBI PAYANGADI FA/15/ Installation of MADM equipments FA/15/ FA/15/ FA/16/ LAYING OFC TO VELAPURAM GSM SITE <1 YEAR > 6 MONTHS FA/16/ LAYING OFC TO CHAKKARAKKAL TOWN GSM FA/16/ PROVIDING FTTH CONNS IN KANNUR BA FA/16/ AERIAL OFC ERETION EZHOME CO OP BANK FA/16/ laying ofc to crpf peringome FA/16/ LAYING OFC TO KIAL MATTANNUR
7
22420302.64 FA FA/16/008498.01 LAYING OFC TO EZHIMALA RAILWAY GSM SITE
<6 MONTHS FA/16/ LAYING OFC TO MATTOOL NORTH GSM SITE FA/16/ LAYING OFC TO VADIKKAL GSM SITE FA/16/ LAYING OFC TO ADUVAPPURAM GSM SITE FA/16/ LAYING OFC TO POOMANGALAM GSM SITE 125580 FA/15/ P&I OF 400AH BATTERY 21 NOS FA/15/ P&I of 600ah battery VRLA for xges FA/16/ AERIAL OFC ERETION MADAI CO-OP BANK FA/16/ LAYING OFC TO URATHUR GSM SITE 14437 FA/16/ LAYING OFC TO KANAKAKKUNNU GSM SITE FA/16/ LAYING OFC TO PONNIAM WEST GSM SITE 36000 FA/16/ LAYYING OFC TO KANHIRAKKOLLI GSM FA/15/ PROCURRING AND INSTALLATION OF 300AH BTY FA/15/ PROCURING AND INSTALLATION OF 1000AH BTY FA/16/ LAYING OFC PAYYANUR TO RAMANTHALI FA/16/ LAYING OFC PAYYANUR TO MATHAMANGALAM 849758 Total
8
REVIEW OF GR IR BALANCE AS ON 16-02-2017
9
PO VENDOR VENDOR NAME CAT AMOUNT DATE REMARKS
REMARKS AEGAN BATTERIES LTD 30 BA 2201 ITI LIMITED Raebareli UT STARCOM INC O30 -6037 ALCATEL LUCCENT INDIA LTD ITI LTD 430 NOKIA SOLUTIONS NETWORK INDIA P TEJAS NETWORKS LIMITED BA 2201 TOTAL BA 2205
10
GRAND TOTAL -8087839.95 PO VENDOR VENDOR NAME CAT AMOUNT DATE REMARKS
REMARKS SHOBHA PV M40 -375 BA 2205 SATHEESH KUMAR CK O40 -320 AE KERALA WATER AUTHORITY A40 -6224 AJAYAN C -20250 Kore Security Services -928 K V OUSEPH JOSE ELECTRICALS E40 -31096 ELECTROTEK ENG -21750 GENERAL ELECTRIC CORPORATION -17420 -53478 INTEGRATED TELECOM CORPORATION MANOJ KS MANOJ MATHEW AZURUDDIN C H BA 2205 TOTAL GRAND TOTAL
11
Details of cost of Modem/EPBT sale and SAP accounting
(In Rs.) Month Instr. Count Cost of Instrument Instrument Sales tax Modem Count Modem Cost Apr-16 1115 637143 31857 793 May-16 746 426286 21314 565 805857 Jun-16 460 262857 13143 949 Jul-16 494 282286 14114 578 824714 Aug-16 762 419429 20971 451 644286 Sep-16 695 397143 19857 434 617714 Oct-16 654 373714 18686 497 708286 Nov-16 498 284571 14229 396 566095 Dec-16 367 209714 10486 391 556762 Total Cost of Modem/EPBT Total in TB Shortfall
12
EXPENDITURE COMPARISON-CONTROLLABLE ITEMS - KANNUR BA
13
WORKING EXPENDITURE STATEMENT JANUARY 2016 VS JANUARY 2017
Details of Expenditure on Payment & Provision for Employment (Remuneration) Sl.No. Particulars Budget Allotment for the F.Y Proportionate Allotment up to JAN 2017 Booked figures ( Up toJAN 2017) Booked figures ( Up to JAN 2016) Variation ( JAN 16 VS JAN 17) Variation w.r.t to Prop Allotment 1 2 3 4 5 6 7 8 1 Salaries 741243 308851 332679 314342 18337 23828 2 Wages 50 21 -21 3 OTA 7 -7 4 Honorarium 0 40 5 Incentive/ Bonus 57 -57 6 Pension Contribution 51685 21535 24715 26639 -1924 3179
14
TOTAL (A) 851625 354844 376570 352611 23959 21726 Sl.No. Particulars
Budget Allotment for the F.Y Proportionate Allotment up to JAN 2017 Booked figures ( Up toJAN 2017) Booked figures ( Up to JAN 2016) Variation (JAN 16 VS JAN 17) Variation w.r.t to Prop Allotment 1 2 3 4 5 6 7 8 7 Leave Salary Contribution 131 55 43 -43 -55 8 Leave Salary Encashment 35877 14949 10787 5022 5765 -4162 9 Employer's contribution towards EPF 12739 5308 5460 4768 692 152 10 Staff Welfare 11 Gratuity 12 Medical Expenses- Indoor 4644 1935 298 896 -598 -1637 13 Outdoor Medical 5156 2148 2583 834 1749 435 14 Leave travel concession 50 21 3 -3 -21 15 House leasing (Rent) 16 Payment under WC Act TOTAL (A) 851625 354844 376570 352611 23959 21726
15
Office Administration (Admin. Expenses)-Controllable Items
Sl.No. Particulars Budget Allotment for the F.Y Proportionate Allotment up to JAN 2017 Booked figures ( Up toJAN 2017) Booked figures ( Up to JAN 2016) Variation ( JAN 16 VS JAN 17) Variation w.r.t to Prop Allotment 1 2 3 4 5 6 7 8 1 Rent 23351 19459 20720 21434 -714 1261 2 Rates & Taxes 179 149 650 180 470 501 3 Water charges 1338 1115 695 686 9 -420 4 Electricity charges 194986 162488 155925 160408 -4483 -6563 5 Fuel charges 42062 35052 25704 30829 -5125 -9348 6 Insurance 56 572 -516 54 7 Repairs & Maintenance 207511 172926 124115 124774 -659 -48811 8 Expenditure on Services taken from Professional 64 53 91 52 39 38 Printing & Stationery 594 495 1082 3315 -2233 587 10 Bill printing & despatch 5820 4850 2424 768 1656 -2426
16
TOTAL (B) 590157 491798 454343 433831 20512 -37455 Sl.No Particulars
Budget Allotment for the F.Y Proportionate Allotment up to JAN 2017 Booked figures ( Up to JAN 2017) Booked figures ( Up to JAN 2016) Variation ( JAN 16 Vs JAN 17) Variation w.r.t to Prop Allotment 1 2 3 4 5 6 7 8 11 Commission 164 137 1573 2873 -1300 1436 13 Advertisement (other than marketing) 248 207 373 96 277 166 14 Travel expenses-Inland 4275 3563 2474 943 1531 -1089 15 Expenditure on transfer 368 307 918 627 291 611 16 Postal Expenses 2639 2199 6599 6953 -354 4400 17 Police Escort Charges/ Security Guards 51153 42628 57425 35325 22100 14798 18 Vehicle running expenses 19164 15970 15194 14950 244 -776 19 Meeting 37 31 95 73 22 64 20 General expenses 731 609 3967 5320 -1353 3358 21 Computer Stationery & Hire Charges 161 134 123 -86 -97 Business Promotion and marketing Expenses 900 750 721 135 586 -29 23 House keeping/ Upkeeping charges 24586 20488 26191 17767 8424 5703 24 Medical Expenses- Indoor 5951 4959 4116 2994 1122 -843 25 Medical Expenses-Outdoor 3873 3228 3198 2634 564 -30 TOTAL (B) 590157 491798 454343 433831 20512 -37455
17
OPSM
18
KANNUR BA Total Completed % = 40 SL NO BUSINESS AREA (1)
No of entries in Asset Register (2) Target upto the month DECEMBER % (3) Entries Checked (4) Entries verified (5) Entries pending (6) No of extra Items to be tallied (7) 1 KANNUR P DIVISION 1350 497 853 2 THALASSERY P DIVISION 1024 309 715 NIL 3 KANNUR T DIVISION 1128 4 CHJERUKUNNU DIVISION 1242 5 KANHANGAD DIVISION 1465 1056 1049 409 6 KASARAGOD KASARAGOD 2095 1565 530 7 MATTANUR DIVISION 1946 721 1225 8 NILESWARAM DIVISION 2294 992 903 1302 111 9 PAYYANUR DIVISION 1728 700 1028 10 SREEKANDAPURAM DIVISION 1354 1012 342 11 KUTHUPARAMBA DIVISION 1524 550 974 12 TALIPARAMBA DIVISION 1084 780 304 13 UPPALA DIVISION 1549 1081 468 14 CMTS 10764 15 BSNL BHAVAN 687 16 INSTALLATION WING 1862 890 972 17 IT CELL 141 TOTAL 33237 13351 13255 19886 Total Completed % = 40
19
COLLECTION TRANSFER COMPARISON KANNUR BA
20
KANNUR SSA COLLECTION TRANSFER COMPARISON
Month Excess/Short Monthly (In Cr.) Progressive (In Cr.) April 25.06 30.02 4.96 May 28.88 53.94 30.68 60.70 1.80 6.76 June 27.31 81.25 30.62 91.32 3.31 10.07 July 28.35 109.60 31.45 122.77 3.10 13.17 August 26.45 136.05 31.32 154.09 4.87 18.04 September 29.15 165.20 32.05 186.14 2.90 20.94 October 29.92 195.12 31.94 218.08 2.02 22.96 November 27.75 222.87 31.11 249.19 3.36 26.32 December 31.35 254.22 30.08 279.27 -1.27 25.05 January 30.17 284.39 29.63 308.90 -0.54 24.51 February 26.13 310.52 March 30.36 340.88
21
ISSUES IN S&D MODULE
22
»OPEN ITEMS UNDER GL 1310401 ( ADVANCE FROM CUSTOMERS-SAP)
496 DOCUMENTS ARE PENDING FOR CLEARING SINCE JUNE MOST OF THE CASES PERTAINS TO INCOMPLETE RETAIL SALES/CTOPUP TRANSACTIONS IN CSCs OF KANNUR BA. PIS HAS BEEN RAISED TO DELETE ALL THE DOCUMENTS »CLARIFICATION HAS BEEN SOUGHT FROM CSC-IN-CHARGES FOR ANOTHER DOCUMENTS WHICH ARE NOT YET CLEARED SINCE JUNE 2016. THE CASES ARE RETAILS SALES / CTOPUP /DSA/FRANCHISEE TRANSACTIONS OCCURRED IN CSC’s WHERE SALE ORDERS ARE COMPLETED BUT ADVANCE COLLECTION NOT TAKEN IN SAP.
23
LIST OF CSCs WHERE MORE NO
LIST OF CSCs WHERE MORE NO.OF ABOVE MENTIONED CASES REPORTED ARE FURNISHED BELOW: CSC -PAYYAVOOR CSC-KOTTIKKOL CSC- IRIKKUR CSC- ALACODE CSC- PERDALA CSC- THALASSERY PHONES CSC- CHERUPUZHA CSC- CHERUVATHUR »OPEN ITEMS IN VARIOUS S&D GL CODES ARE MAINLY DUE TO WRONG/DUPLICATE RETAIL SALES ENTRIES AND CUSTOMER NON-CLEARING AT CSCs OF KANNUR BA. » IT IS OBSERVED THAT SIM CARDS/TOPUP CARDS ETC ARE ISSUED AT SOME CSCs WITHOUT CREATING SALE ORDERS AND INVOICES AND ALSO IN SOME CASES IT IS NOTICED THAT STOCK ARE ISSUED BUT INVOICES ARE CREATED AFTER SEVERAL DAYS FOR THE SAME.
24
»PHYSICAL VERIFICATION OF STOCK HAS TO BE CARRIED OUT IN ALL CSCs BEFORE 31st MARCH THE TOTAL PHYSICAL STOCK IN CSCs SHOULD EXACTLY MATCH WITH THE SAP STOCK REPORT.
25
ESTABLISHMENT
26
Medical Bills (a) Bills received up to (both OP & IP cases of serving & retirees) has since been settled for all clear cases except those pending in Circle office-32 cases amounting to 25 L (appro…)
27
(b) Bills pending : (i) OP- Serving : 131 Retd
(b) Bills pending : (i) OP- Serving : Retd : T : (ii) IP- Serving : Retd : T : 157
28
© Bills pending for clearance in Feb-2017 : 50
TA Bills :- (a) Total Bills Received (from ) : 700 (b) Bills settled : © Bills pending for clearance in Feb : Pension :- (a) Cases up to processed & sent to CCA TVM. (b) No delay was reported so far regarding the receipt of RG & Commuted Value. (c ) Payment of Leave encashment for the retirees of & are pending and will be cleared by Feb-2017 end.
29
KANNUR BA PROFIT & LOSS ACCOUNT 2016-17 ( AS ON 31.01.2017)
BSNL CONSOLIDATED PROFIT&LOSS STATEMENT Current Fiscal Year Previous Fiscal Year Revenue from Operations 2,59,45,46,150.34 2,38,69,13,047.43 Other Income 4,20,73,145.77 2,26,53,177.15 2,63,66,19,296.11 2,40,95,66,224.58 Employees' Remuneration and Benefits 24 74,55,46,025.42 74,21,63,274.91 Financial Cost 0.00 64.96 Depreciation 29,13,42,202.90 37,33,37,618.24 Other expenses -Administrative,Operating & Other Exp 26 53,61,63,242.32 49,00,94,627.94 -Licence fee and Spectrum fee Total Expenses 1,57,30,51,470.64 1,60,55,95,586.05 Profit/(Loss) before prior period items 1,06,35,67,825.47 80,39,70,638.53 Prior-period items (net) 5,44,952.56 Profit/(Loss) before tax 80,34,25,685.97 Tax expense : - Current tax - Tax for earlier years - Deferred Tax Total Tax Expenses Profit/(Loss) for the year KEY RATIOS Employee Cost to Turnover 28.28% 30.80% Administration Expenditure to Turnover 20.34% Depreciation to Turnover 11.05% 15.49%
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.